Skip to main content

BHP Billiton Canada Inc. - MV2001L2-0008

mining development of Beartooth pipe, pigeon pipe and sable pipe
Uploaded On or After
Uploaded On or Before
Displaying 1 - 100 of 119
Other
Document Received/Sent Uploaded
NCCP Registration Form.doc (301.5 KB)
P_Chapman_Summary_Synthesis Report_Mar08.pdf (1.04 MB)
P_Chapman_Ammonia Report_Mar08.pdf (73.48 KB)
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2001L2-0008 - BHP - WL Reclamation Monitoring Plan - Request for Extension of Submission Deadline - Mar 15_04.pdf (30.14 KB)
MV2001L2-0008 - BHP - WL Reclamation Monitoring Plan Extension - Extension Granted - Mar 18_04.pdf (22.79 KB)
MV2001L2-0008 - Issuance Letter of Type A Water License from Aug2002-Aug2009 - Oct30 02.pdf (2.22 MB)
MV2001L2-0008 - Preliminary Screening.pdf (376.89 KB)
MV2001L2-0008 - BHP Acknowledgement of No Interventions Received - Mar22 07.pdf (66.08 KB)
MV2001L2-0008 - WLWB Assumes Licencing Responsibilites - Feb28 06.pdf (264.04 KB)
MV2001L2-0008-Ltr-Van-AddressChange-Dec2-05.pdf (275.94 KB)
MV2001L2-0008 - Reasons For Decision - Oct03 02.pdf (5.75 MB)
Security and Water Use Fees
Document Received/Sent Uploaded
MV2001L2-0008 - Reclamation Liability Estimate Report - Jan01 01.pdf (6.94 MB)
MV2001L2-0008 - Letter of Credit - Jan06 05.pdf (347.85 KB)
SNP Program
Document Received/Sent Uploaded
MV2001L2-0008 - SNP - BHP Sable Clarification Request - Feb13 09.pdf (72.98 KB)
MV2001L2-0008 - SNP Clarification - WLWB Direction to BHPs Letter - Feb19 08.pdf (273.47 KB)
MV2001L2-0008 - SNP Clarification Request from BHPB to INAC - Dec07 07.pdf (200.74 KB)
MV2001L2-0008- SNP- Clarification Request- Receipt Of Nov29 Letter- Dec07.pdf (12.64 KB)
MV2001L2-0008 - BHPB Request to Reduce Sampling Frequency at Be2-008 - May24 06.pdf (421.92 KB)
2. Initial/Renewal Application
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
MV2001L2-0008 - BHP Billiton - 2007 EA and WL Annual Report - Apr 30 08.pdf (1.77 MB)
MV2001L2-0008 - 2005 Environmental Workshop - Recommendations from IEMA - Apr08 05.pdf (236.2 KB)
MV2001L2-0008 - 2006 Annual Report - Apr 06.pdf (2.14 MB)
MV2001L2-0008 - 2005 Annual Report - Jul 06.pdf (1.79 MB)
MV2001L2-0008 - 2004 Annual Report - May 05.pdf (1.92 MB)
AllWLFiles- 04 Annual Report Extended to Apr30-05 - Mar24-05.pdf (310.74 KB)
Assorted Management Plans
Document Received/Sent Uploaded
MV2001L2-0008 - Prelim. Design of Water Control Structures - Sable, Pigeon, and Beartooth Pit Developments - Aug22-01.pdf (8.89 MB)
Designs and As-Builts
Document Received/Sent Uploaded
MV2001L2-0008 - Notification of Updated Beartooth Pit Design - May20 05.pdf (637.33 KB)
Operations and Notifications
Document Received/Sent Uploaded
MV2001L2-0008 - Central Balance Tank - BHP Letter to INAC - May23 08.pdf (74.96 KB)
MV2001L2-0008 - Minor Changes to Spill Reporting - Jan11 05.pdf (136.9 KB)
MV2001L2-0008 - Water Collection System Clarification - Apr05.pdf (16.68 KB)
MV2001L2-0008 - Notification of Commencement of Pumping - Bearclaw Lake and Desperation Pond - Jun01 07.pdf (1.26 MB)
N7L2-1616-MV2001L2-0008-FileNote-NiskinSamplers-May05.pdf (278.23 KB)
Other
Document Received/Sent Uploaded
MV2001L2-0008 - Bearclaw Diversion Dam - Construction Specifications - Dec 3_02.pdf (1.35 MB)
MV2001L2-0008 - Chloride - BHPB Response to Comments - Apr22 09.pdf (267.56 KB)
MV2001L2-0008 - Chloride WQO - EC Comments on the Jan 2009 Report - Jan23 09.pdf (52.89 KB)
MV2001L2-0008 - Site Specific Water Quality Objective for Choride - DFO Comments - Jan12 09.pdf (50.66 KB)
MV2001L2-0008 - Site Specific Water Quality Objective for Choride - IEMA Comments - Jan14 09.pdf (307.96 KB)
MV2001L2-0008 - Site Specific Water Quality Objectives for Chloride - INAC Comments - Jan20 09.pdf (701.15 KB)
MV2001L2-0008 - Site Specific Water Quality Objective for Chloride - Extension to Comment Deadline - Jan08 09.pdf (13.43 KB)
MV2001L2-0008 - Pit Lake Studies - BHP Extension Request - Dec19 09.pdf (12.43 KB)
MV2008L2-0008 - Water Quality Objectives for Chloride - Extension to Review - Dec01 08.pdf (51.28 KB)
MV2001L2-0008 - SPB - Site Specific Water Quality Objective for Chloride - Oct31 08.pdf (14.2 MB)
MV2001L2-0008 - Site Specific Water Quality Objective for Chloride - Oct31 08.pdf (13.6 MB)
MV2003L2-0008 - Presentation Pit Lakes - Part 1 Studies - Part 2 Meromixis - Mar24 08.pdf (1.89 MB)
MV2001L2-0008 - Tier I Environmental Risk Assessment for Molybdenum.pdf (12.55 MB)
MV2001L2-0008 - Tier I Environmental Risk Assessment for Chloride.pdf (3 MB)
MV2001L2-0008 - Tier I Environmental Risk Assessment for Zinc.pdf (1.34 MB)
MV2001L2-0008 - Chloride Criterion - Eco Metric and INAC Additional Clarification - Feb08 08.pdf (1.08 MB)
MV2001L2-0008 - Tundra Soil Study - Board Direction - Jan30 08.pdf (53.83 KB)
MV2001L2-0008 - Chloride Criterion - BHPs Clarification Request - Ecometrix Response - Jan21 08.pdf (36.32 KB)
MV2001L2-0008 - Chloride Criterion - BHPs Request for Clarification - INAC Response with CCME Protocol - Jan23 08.pdf (10.08 MB)
MV2001L2-0008 - Tundra Soil Study - Jan18 08 Staff Report - Jan24 08.pdf (549.06 KB)
MV2001L2-0008 - Tundra Soil Study - BHP Response to Comments - Dec21 07.pdf (123.35 KB)
MV2001L2-0008 - Chloride Criterion Report - WLWB Request for Reviewer Clarification to BHPBs Responses - Dec18 07.pdf (247.56 KB)
MV2001L2-0008 - Chloride Criterion Report - BHP Response - Nov19 07.pdf (186.18 KB)
MV2001L2-0008 - Tundra Soil Study - EM From LKDFN Requesting a Meeting - Nov12 07.pdf (12.4 KB)
MV2001L2-0008 - Tundra Soil Study - LKDFN Still Requesting a Meeting - Nov12 07.pdf (12.38 KB)
MV2001L2-0008 - Chloride Tier2 ERA - Board Approval Re Extension - Aug15 05.pdf (168.52 KB)
MV2001L2-0008 - Tundra Soil Study - Comment Table - INAC, GNWT, ENR - EM Dist Nov09 07.pdf (193.14 KB)
MV2003L2-0008 - Chloride Review - BHP EM Request For Extension for Response Date - Nov02 07.pdf (13.64 KB)
MV2003L2-0008 - Tundra Soil Study - ENR Comments - Nov02 07.pdf (98.47 KB)
MV2001L2-0008 - Proposed Chloride Discharge Criterion - Feb 07.pdf (15.44 MB)
MV2001L2-0008 - Chloride Criterion - Board Approval of Extension Request to Apr20 - Mar20 07.pdf (184.71 KB)
MV2001L2-0008 - Chloride Criterion - WLWB and EC Reviews - Oct15 07.pdf (1.73 MB)
MV2001L2-0008 - Tundra Soil Study - SRK Investigation of Seep 19 Acidity - Sep28 07.pdf (2.61 MB)
MV2001L2-0008 - EBA Open Pit Flooding Study - 2nd Revision - Jun 07.pdf (6.26 MB)
MV2001L2-0008 - Chloride Criterion Tier 2 - Review Comments - Apr 07.pdf (106.38 KB)
MV2001L2-0008 - Chloride Criterion - Definition of Deleterious - Apr25 07.pdf (16.46 KB)
MV2001L2-0008 - Review Comments on Tier 2 Chloride Report from EC, IEMA, INAC - Apr25 07.pdf (414.54 KB)
MV2001L2-0008 - SPB Chloride Discharge Critieron - Cover Letter - Jan31 07.pdf (180.33 KB)
MV2001L2-0008 - Chloride Criterion - Staff Report Re 6 Month Extension - May11 06.pdf (252.73 KB)
MV2001L2-0008 - Pit Lakes Study Tasks 1 and 2 - Board Direcetion to Respond to IEMA Comments by May05 - Mar08 06.pdf (1.46 MB)
MV2001L2-0008 - Pit Lakes Study - State of Knowledge of Pit Lakes - Board Receipt Letters - Dec16 05.pdf (4.78 MB)
xxMV2001L2-0008-Tasks1And2-PitLksStudy-Distribution Cover Only- Dec05.pdf (67.81 KB)
MV2001L2-0008 - Bearclaw Drawdown Summary - Oct25 05.pdf (173.56 KB)
MV2001L2-0008 - 2005 Freshet Seepage Report - Aug29 05.pdf (1.34 MB)
MV2001L2-0008 - Pit Lakes Study - Board Approval for the ToR - May17 05.pdf (1.03 MB)
MV2001L2-0008 - Chloride Criterion - BHPB Extension Request - April28 05.pdf (44.04 KB)
MV2001L2-0008 - Distribution of Request for BHP Response to Reviewer Comments - Mar16 05.pdf (564.96 KB)
MV2001L2-0008 - Chloride Criterion - Board Approval of Tier1 ERA - Direction to Begin Tier 2 ERA - Mar11 05.pdf (596.54 KB)
MV2001L2-0008 - IEMA Review of Pit Lakes Study ToR - Feb22 05.pdf (224.1 KB)
MV2001L2-0008 - Chloride Criterion - BHP Response to Tier 1 ERA - Feb16 05.pdf (307.67 KB)
MV2001L2-0008 - Distribution of Pit Lakes Study ToR for Review - Jan05 05.pdf (262.96 KB)
MV2001L2-0008 - Receipt of the Pit Lakes Study ToR - Jan05 05.pdf (192.07 KB)
MV2001L2-0008 - Chloride Criterion - Letter from MVLWB to BHP Re Tier 1 ERA - Jan04 05.pdf (637.55 KB)
MV2001L2-0008 - Pit Lakes Study ToR - Oct31 04.pdf (31.97 MB)
MV2001L2-0008 - Grizzly Lake Aquatic Assessment - Jan01 04.pdf (11.85 MB)
MV2001L2-0008 - Chloride Criterion - Fax Distribution of All Comments Recieved - Apr30 07.pdf (202.41 KB)
SNP Reports
Document Received/Sent Uploaded
MV2001L2-0008 - BHP - Surveillance Network Program Section D Part Six - Jan 9_03.pdf (50.44 KB)
Waste Rock and Seepage
Document Received/Sent Uploaded
MV2001L2-0008 - BHP - 2003 Waste Rock Storage Area, Seepage and Survey Report - Feb 27 2004.pdf (10.24 MB)
MV2001L2-0008 - BHP - Acid Alkaline Rock Drainage - INAC Water Resources Comments - Feb 12_03.pdf (270.54 KB)
MV2001L2-0008 - BHP - Acid Alkaline Rock Drainage - Request for Comments - Jan 22_03.pdf (73.26 KB)