Tlicho Government - W2021X0001

This Permit entitles the Permittee to conduct the following land-use operation:a) Installation of a fibre optic cable;b) the use of motorized earth-drilling machinery;c) Use of fuel;d) the use of self-propelled earth-moving equipment, and vehicles and machines over 10 tons;e) Clearing of vegetation as required in the Right of Way;f) Ongoing operation and maintenance.The Project is to build 115 kilometres of transport fibre to connect Whatì to NorthwesTel's fibre line to replace the existing microwave radios. The TASR provides a clear Right-of-Way and sufficient space for the installation of the fibre along the edge of the newly build road. 

Documents

Displaying 1 - 1 of 1
Uploaded On or After
Uploaded On or Before
9. GIS Data
GIS Data
Document Received/Sent Uploaded
Tlicho Fibre Optic Project - Land Use Permit Application - GIS Data - Mar 7_21.zip (89.13 KB) March 7, 2021 March 8, 2021