Tlicho Government - W2021X0001

This Permit entitles the Permittee to conduct the following land-use operation:a) Installation of a fibre optic cable;b) the use of motorized earth-drilling machinery;c) Use of fuel;d) the use of self-propelled earth-moving equipment, and vehicles and machines over 10 tons;e) Clearing of vegetation as required in the Right of Way;f) Ongoing operation and maintenance.The Project is to build 115 kilometres of transport fibre to connect Whatì to NorthwesTel's fibre line to replace the existing microwave radios. The TASR provides a clear Right-of-Way and sufficient space for the installation of the fibre along the edge of the newly build road. 

Documents

Displaying 1 - 2 of 2
Uploaded On or After
Uploaded On or Before
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
Tlicho Fibre Optic Project - Land Use Inspection Report - September 29 2021 - Oct 5_21.pdf (1.84 MB) October 5, 2021 October 26, 2021
Tlicho Fiber Optic Project - Land Use Inspection Report - August 26 2021 - Sept 3_21.pdf (1.43 MB) September 3, 2021 September 16, 2021