Skip to main content

De Beers Canada Inc. - Snap Lake - MV2001L2-0002

Snap Lake Project - an underground diamond mine.
Accomanied by Permit MV2001C0012.

Renewed into Licence MV2011L2-0004. 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 25 of 25
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
MV2001L2-0002 - Notification for Deposition of Slurry into Cell 4 - May11-12.pdf (138.01 KB)
MV2001L2-0002 - IL6 Ditch Design Report - Mar21-12.pdf (3.47 MB)
MV2001L2-0002 - DeBeers response to review comments - Feb27-12.pdf (464.55 KB)
MV2001L2-0002 - Comment on IL6 Ditch Construction - DeBeers - Feb24-12.pdf (231.06 KB)
MV2001L2-0002 - Comment on IL6 Drainage Ditch Design - YKDFN - Feb24-12.pdf (47.56 KB)
MV2001L2-0002 - Letter to MVLWB on IL6 Ditch Design - SLEMA - Feb23-12.pdf (41 KB)
MV2001L2-0002 - Comment on IL6 ditch detailed design plan - LKDFN - Feb23-12.pdf (40.35 KB)
MV2001L2-0002 - Comment on Inland Lake 5 Ditch Design - ENR - Feb23-12.pdf (129.8 KB)
MV2001L2-0002 - Freshet Water Management and Mitigation Strategy - Feb21-12.pdf (856.22 KB)
MV2001L2-0002 - Comment on IL6 ditch design - DFO - Feb20-12.pdf (79.53 KB)
MV2001L2-0002 - Request for Review - Inland Lake 6 Ditch Design - Feb16-12.pdf (1.31 MB)
MV2001L2-0002 - Staff Report for Proposed changes to Water control system - Feb16-12.pdf (146.38 KB)
MV2001L2-0002 - IL6 Ditch Design Report - Feb16-12.pdf (2.93 MB)
MV2001L2-0002 - Completion of construction for diffuer with as builts - Dec19-11.pdf (3.88 MB)
MV2001L2-0002 - request for comments - Plan - Sept29-09.pdf (1.16 MB)
MV2001L2-0002 - Phase III Review - SLEMA - May28-09.pdf (68.95 KB)
MV2001L2-0002 - DeBeers - Comment on Phase III Embankment Raise Design - INAC - May28-2009.pdf (1.09 MB)
MV01L2-02 Phase III Embankment Raise April 09.pdf (8.51 MB)
MV01L2-02 Construction Design Review Dec09-08.pdf (228.47 KB)
MV01L2-02 East Cell Perimeter Water Control Structures.pdf (21.85 MB)
MV01L2-02 North Pile East Cell Embankments-Design Report.pdf (6.93 MB)
MV01L2-02 North Pile East Cell Embankments-Appendices.pdf (22.62 MB)
MV01L2-02 Anfo Dyke 2008.8.18.pdf (34.55 KB)
MV01L2-02 Anfo Sump 2008.8.18.pdf (64.26 KB)
AsBuilt-DeicingSump-Feb07.pdf (7.78 MB)