Skip to main content

Imperial Oil Resources Ventures Ltd. - MV2005L1-0005

Water use and deposits associated with construction and operation of the Mackenzie Gas Project in the Gwichin Settlement Area. Inuvik and Campbell Lake infrastructure camps, construction of roads and pipeline right-of-way. 
After a public process in early 2016, both the NEB and OROGO extended the sunset clause to December 31, 2022.  
 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Other
Document Received/Sent Uploaded
MV2005L1-0005 - Imperial Oil Resources - Letter to NEB re Cost and Schedule update December 2013 - Dec18-13.pdf (23.64 KB)