Imperial Oil Resources Ventures Ltd. - MV2005P0014

Mackenzie Gas Project -  Pipeline-related developments on CROWN LANDS within the Gwichin Settlement Area.  Infrastructure site near Inuvik 6 borrow pits. 76km pipeline. access roads. temporary workspaces -map coords not accurate
After a public process in early 2016, both the NEB and OROGO extended the sunset clause to December 31, 2022.  
 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Other
Document Received/Sent Uploaded
MV2005P0014 - Imperial Oil Resources - Letter to NEB re Cost and Schedule update December 2013 - Dec18-13.pdf (23.62 KB)