Skip to main content

Deze Energy Corporation - MV2007I0033

Power transmission line.  The Taltson Expansion Project is a hydroelectric project that adds a new 36 MW power plant at the existing 18 MV Taltson Gorges Plants.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 21 of 21
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2007L4-0029 - MV2007I0033 - DRAFT Terms of Reference - DECL - Aug23-10.pdf (383.1 KB)
MV07I33-AppFee-May07.pdf (65.79 KB)
MV07I33-LUPApp-May07.pdf (252.54 KB)
MV07I33 Project Licensing and Permitting Apr.24-08.pdf (177.49 KB)
MV2007I0033 - NTS Map Sheets - Sep25-07.pdf (42.19 KB)
MV07I33- re Resubmission of Related Water Licence Application-Aug07.pdf (99.83 KB)
MV07I33-MV07L4-29- Supporting Docs-Sep07.pdf (3.9 MB)
MV07I33-MV07L4-29-FileNoCorrection-Aug07.pdf (404.4 KB)
MV07I33- 22b- Further Study-Jul07.pdf (137.54 KB)
MV07I33-Application Deemed Complete-Jun18-07.pdf (154.46 KB)
CoverLetter.pdf (68.31 KB)
MV07I33-application-revised-Jun07.pdf (1.32 MB)
MV07I33-RevisedApp.doc (81.5 KB)
MV07I33-RevisedApp.pdf (51.06 KB)
PrelimArchRescan2004.pdf (1.18 MB)
SummaryofTaltsonInformationSessionsandMeetings.pdf (47.88 KB)
TaltsonHydroConsultationHistoryandPlan.pdf (68.5 KB)
MV07I33-MV07L4-29-SR-NewLUPApp-Oct07.pdf (473.48 KB)
MV07I33- Application Deemed Incomplete-May15-07.pdf (264.92 KB)
MV07I33-TaltsonProjectDescripton-Mar07.pdf (15.38 MB)
CommunityConsultation.pdf (6.06 MB)