Skip to main content

Deze Energy Corporation - MV2007L4-0029

The Taltson Expansion Project is a hydroelectric project that adds a new 36 MW power plant at the existing 18 MW Taltson Twin Gorges Plant.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 9 of 9
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV07L4-29 Project Licensing and Permitting Apr.24-08.pdf (177.54 KB)
MV07I33-MV07L4-29-FileNoCorrection-Aug07.pdf (404.4 KB)
MV07L4-29-AppComplete-Aug07.pdf (158.59 KB)
MV07L4-29-WLApp-Deze-Aug07.pdf (670.92 KB)
ProjectDescription-May07.pdf (36.8 MB)
Questionnaire-Aug07.pdf (133.73 KB)
MV2007L4-0029- Deze shapefile.zip (25.9 KB)
MV07I33-MV07L4-29-SR-NewLUPApp-Oct07.pdf (473.48 KB)
MV2007L4-0029 - NTS Map Sheets - Sep25-07 - Copy.pdf (42.19 KB)