Skip to main content

Canadian Natural Resources Limited - MV2010A0031

Post construction wellsite maintenance includes: Equipment Mobilization, pump out and backfill flare put and on site campsire sumps, sill in slumped area around wellhead culvert, remove helipad, roll back top soil and subsoil to teardrop around well centre, and reseed bare areas to enhance vegetation cover at both the wellsite and sump at campsite.      

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
1. Permit - Licence - Other Issuances
Security and Water Use Fees
Document Received/Sent Uploaded
MV2010A0031 - LUP Application Fee - Jul13-10.pdf (104.24 KB)
MV2010A0031 - Returned Cheques for Application - Jun17-10.pdf (56.55 KB)
MV2010A0031 - LUP Application Fees - May31-10.pdf (63.18 KB)