Skip to main content

Jayhawk Frontier Exploration Ltd. - MV2010Q0040

Preliminary work required involves blasting, removing and stockpiling material for testing purposes. Additionally, a 10 acre area for a future equipment site will be cleared and leveled. A water well will also be drilled – no water will be utilized at this time, the water well is simply in preparation for use in the future and will be addressed in our future addition to this Land Use Permit after Phase One is complete. Water well will be 6.65 inches or 18 centimetres. A map outlining the captioned activities is attached for further perusal. Also, approximately 75 kilograms of explosives will be utilized for the blasting procedure. 10 metre holes will be drilled into the bench approximately one meter apart for a distance of 100 metres. 0.25kg of explosive will be placed in each hole. Explosives will be stored in a certified explosive-mag building located near the stockpile area. One additional 50 foot skid-mounted trailer will be setup on the future equipment site and will be utilized as an office.  
Uploaded On or After
Uploaded On or Before
Displaying 1 - 25 of 25
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2010Q0040 - Jayhawk Frontier Exploration Ltd - Final Clearance Letter - Jan21-16.pdf (126.44 KB)
MV2010Q0040 - Issuance Letter with Conditions - Aug19-10.pdf (1.01 MB)
Final Plan and Clearance
Document Received/Sent Uploaded
MV2010Q0040 - Jayhawk Frontier - Requisition for payment - Jan25-16.pdf (283.39 KB)
MV2010Q0040 - Jayhawk Frontier Exploration Ltd - Final Clearance - Staff Report - Jan21-16.pdf (219.95 KB)
MV2010Q0040 - Jayhawk Frontier - Final Plan request - Sept4-15.pdf (52.92 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
MV2010Q0040 - Application Fees - Jul08-10.pdf (107.88 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2010Q0040 - Staff Report - Aug19-10.pdf (113.65 KB)
MV2010Q0040 - INAC Mineral Claim for Application - Jul09-10.pdf (298.11 KB)
MV2010Q0040 - Application Deemed Complete - Jul09-10.pdf (156.94 KB)
MV2010Q0040 - NEW LUP Application - Jul07-10.pdf (2.05 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2010Q0040 - Jayhawk Response to PWNHC Comments - Aug09-10.pdf (8.79 MB)
MV2010Q0040 - Jayhawk Response to July 30 ENR Letter - Aug09-10.pdf (437.33 KB)
MV2010Q0040 - Jayhawk Response to July 30 INAC Letter - Aug09-10.pdf (286.92 KB)
MV2010Q0040 - Comments Received - ENR - Jul30-10.pdf (190.16 KB)
MV2010Q0040 - Comments Received - INAC - Jul30-10.pdf (429.89 KB)
MV2010Q0040 - Comments Received - PWNHC - Jul28-10.pdf (109.49 KB)
MV2010Q0040 - Jayhawk Response to ECAN - Jul28-10.pdf (135.49 KB)
MV2010Q0040 - Comment Received - EC - Jul23-10.pdf (54.3 KB)
MV2010Q0040 - Comment Received - DOT - Jul22-10.pdf (74.71 KB)
MV2010Q0040 - Request for Comments - LUP Application - July09-10.pdf (299.34 KB)
Preliminary Screening
Document Received/Sent Uploaded
MV2010Q0040 - Preliminary Screening Report - Aug19-10.pdf (379.36 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2010Q0040 - Jayhawk Frontier Exploration - Inspection Report for July 29 2015 - GNWT Lands - Dec1-15.pdf (409.75 KB)
MV2010Q0040 - Jayhawk - July 30 2013 Inspection Report - Sept26-13.pdf (421.46 KB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
MV2010Q0040 - Final EIA - Vegitation and Habitat - Jun14-11.pdf (3.12 MB)
MV2010Q0040 - Final EIA For MVLWB - Jun13-11.pdf (5.41 MB)