North American Tungsten - MV2012C0014
Status:
Closed
Authorization:
Land Use Permit
Activity:
Mining Exploration
Start:
June 19, 2012
Expiry:
June 18, 2017
Staff:
Kim Murray
Mineral exploration on the CanTung mine mineral leases belonging to North American Tungsten. Work will include geophysics, geochemistry, geological mapping, and surface diamond drilling. A road will need to be pioneered to accommodate the drill rig as well. The road will be 1-2 km in length and no more than 12 ft wide. The construction of the road will be undertaken with an excavator as the spoe of the area is steep. A Cat dozer may be utilized as well.
Documents
Displaying 1 - 25 of 25
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
MV2012C0014 - NATCL - Final Clearance Letter - May10-18.pdf (147.14 KB) | ||
MV2012C0014 - NATCL - Type A LUP - Issuance Letter with Conditions - Jun20-12.pdf (775.41 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2012C0014 - NATCL - Final Clearance - Staff Report - May10-18.pdf (172.01 KB) | ||
MV2012C0014 - NATCL - Final Clearance Recommendation - INAC Inspector - Jan16-18.pdf (107.37 KB) | ||
MV2012C0014 - NATCL - Request for final plan submission - Jun15-17.pdf (295.57 KB) | ||
MV2012C0014 - NATCL - Request to discontinue LUP - final plan submission - May6-14.pdf (829.99 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2012C0014 - NATCL - Application - Land Use Fees - May8-12.pdf (59.86 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
MV2012C0014 - NATCL - Application - Staff Report - Jun20-12.pdf (1.31 MB) | ||
MV2012C0014 - NATCL - Application - Deemed Complete - May17-12.pdf (243.36 KB) | ||
MV2012C0014 - NATCL - Application - Revised - May16-12.pdf (4.2 MB) | ||
MV2012C0014 - NATCL - Application - May7-12.pdf (721.31 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2012C0014 - NATCL - Application - Response to Review Comments - Jun10-12.pdf (1.24 MB) | ||
MV2012C0014 - NATCL - Application - Request for Response to Review Comments - Jun6-12.pdf (108.85 KB) | ||
MV2012C0014 - NATCL - Application - Request for Extension to Review Period - EC - Jun5-12.pdf (40.36 KB) | ||
MV2012C0014 - NATCL - Application - Comments - ENR - Jun5-12.pdf (164.08 KB) | ||
MV2012C0014 - NATCL - Application - Comments - DCFN - Jun1-12.pdf (186.2 KB) | ||
MV2012C0014 - NATCL - Application - Comments - AANDC Inspector - May30-12.pdf (108.95 KB) | ||
MV2012C0014 - NATCL - Application - Comments - AANDC SMD - May30-12.pdf (25.75 KB) | ||
MV2012C0014 - NATCL - Application - Comments - AANDC - SMD - May30-12.pdf (56.45 KB) | ||
MV2012C0014 - NATCL - Application - Comments - DFO - May23-12.pdf (1.1 MB) | ||
MV2012C0014 - NATCL - Application - Request for Review - May17-12.pdf (918.89 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2012C0014 - NATCL - Application - Preliminary Screening Report - Jun20-12.pdf (357.71 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
MV2012C0014 - NATCL - INAC Inspection Deficiencies - Follow-up Report - May17-16.pdf (3.25 MB) | ||
MV2012C0014 - NATCL - Inspection Report for May 10 2016 - INAC Inspector - May13-16.pdf (1.91 MB) | ||
MV2012C0014 - NATCL - Notice of Failure to Comply - INAC Inspector - May12-16.pdf (240.49 KB) |