Skip to main content

Sambaa Ke First Nation - MV2012L3-0007

Municipal Water Licence  - Construction of a new water treatment plant to be located on the same site location as the existing water treatment plant. Obtain raw water from Trout Lake to be stored in the water reservoir twice per year. It is estimated that approximately 11000m3 and 16000m3 of water in the design year 2034 from the raw water source.  Disposal of wastewater generated from the treatment of raw water (to produce potable water) into the sewage lagoon. Surface dischatge of the generated wastewater from the backwashing of the membrane filtration system in the new water treatment plant. Replaced by MV2018L3-0001.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 8 of 8
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2012L3-0007 - Sambaa Ke - Trout Lake Hazardous Waste MGMT Community Visit Oct 2011 - Feb6-14.pdf (3.04 MB)
MV2012L3-0007 - Sambaa Ke - Draft Municipal Environment Waste MGMT Practices and Monitoring Program - Jan21-14.pdf (973.54 KB)
MV2012L3-0007 - Trout Lake - Additional information on wastewater generated by new water treatment plant - Jun21-13.pdf (125.75 KB)
MV2012L3-0007 - SKDB - WL Application incomplete - Jan4-13.pdf (216.79 KB)
MV2012L3-0007 - Application Fee - Nov21-12.pdf (164.78 KB)
MV2012L3-0007 - Trout Lake - Signed WL Application - Oct29-12.pdf (42.48 MB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2012L3-0007 - Sambaa Ke Dene Band - March 24 2011 Inspection Report - Mar29-11.pdf (766.83 KB)
MV2012L3-0007 - Sambaa Ke Dene Band - June 11 2009 Inspection Report - Jun11-09.pdf (1.13 MB)