Skip to main content

North American Tungsten - MV2012S0011

Geotechnical drilling and other studies to characterize subsurface conditions at two possible tailings storage facility locations within the Cantung mining poroperty. No new facilities, structures or camps will be required. Drill crews will stay at the Cantung mine site operated by NATCL and will be transported to and from the drill site by truck. Helicopter support may be required on occasion.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
MV2012S0011 - NATCL - Application - Preliminary Screening Report - Jun7-12.pdf (392.27 KB)