Skip to main content

Enbridge Pipelines (NW) Inc. - MV2013X0018

​Enbridge has applied for a LUP for use of land for the purpose of off-right of way remediation and reclamation at the KP 380.4 Willow Lake River release site. In 2011, off-right of way activities at the release site were authorized under Section 17 of the Mackenzie Valley Land Use Regulations as part of the emergency land use operation carried out in response to the Willowlake River KP380.4 pipeline leak. A Reclamation Plan for the site was approved by the National Energy Board in April 2012 and reclamation of this area is ongoing.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 8 of 8
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
MV2013P0011 MV2013X0018 - Enbridge - Spill Contingency Plan and Waste Management Plan updates - Sept25-15.pdf (44.56 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
MV2013P0011 MV2013X0018 - Enbridge - Spill Contingency Plan - Version 2.2 - April 25_18.pdf (344.5 KB)
Waste Management Plan
Document Received/Sent Uploaded
MV2013P0011 MV2013X0018 - Enbridge - Waste Mangement Plan - Version 4 - April 18_18.pdf (82.99 MB)
MV2013X0018 - Enbridge Pipelines NW Inc - Approval Letter - Waste Management Plan v3 - Sept1-17.pdf (434.23 KB)
MV2013X0018 - Enbridge Pipelines NW Inc - Waste Management Plan v3 - Staff Report and Comments - Sept1-17.pdf (583.34 KB)
MV2013X0018 - Enbridge Pipeline - Request for comments on Waste MGMT Plan - Version 3 - Jul17-17.pdf (347.52 KB)
MV2013P0011 MV2013X0018 - Enbridge - Waste Mangement Plan - Version 3 - July 12_17.pdf (38.02 MB)
MV2013P0011 MV2013X0018 - Enbridge - Waste Management Plan - Version 2 - Apr15-15.pdf (299.22 KB)