Skip to main content

Canadian Zinc Corporation - MV2014F0013

​Construction, maintenance and use of an all weather road approximately 170 km long connecting the Prairie Creek Mine to the TetcelaTransfer Facility (TTF, Phase 1), and from the TTF to the Nahanni Butte access road which in turn joins the Liard Highway (Phase 2) to allow haulage of mineral concentrates out, and operating supplies in. Cleared normal right-of-way to be up to 20 m wide but may be up to 35 m when there are steep side-slopes, road surface width 5-8 m. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. Barge landing/set-down areas both sides of Liard River. For non-federal portion of the road. 

This Permit is accompanied by Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002

Please Note: This Permit and associated Water Licence are linked to Parks Canada Land Use Permit PC2014F0013 and Water Licence PC2014L8-0006

Uploaded On or After
Uploaded On or Before
Displaying 1 - 100 of 310
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
CZN – ASR – Extension to Term - Oct7_24.pdf (766.43 KB)
CZN - ASR - Permit - Amendment - Aug30_22.pdf (773.59 KB)
CZN - Approval - Submission Change - May 21 2021 - Jun6-21.pdf (604.8 KB)
CZN - ITRP Composition Change - Staff Report and Comments - Apr8_21.pdf (318.02 KB)
CZN - Approval - ITRP Composition Change - Apr13-21.pdf (125.03 KB)
CZN - ITRP Terms of Reference -Staff Report and Comments - Jan16-20.pdf (1.13 MB)
CZN - All Season Road Project - Administrative Update and Land Use Fee Request - Jan16-20.pdf (571.8 KB)
CZN - All Season Road Project - Admin Update - Staff Report - Jan16-20.pdf (162.45 KB)
CZN - Approval - ITRP Terms of Reference - Jan16-20.pdf (125 KB)
CZN - ASR - Reasons for Decision - Dec10-19.pdf (864.5 KB)
CZN - All Season Road Project - Issuance Letter with Permit-Conditions - Type A LUP - Nov13-19.pdf (713.99 KB)
CZN - All Season Road Project - Issuance - Staff Report and Comments - Nov7-19.pdf (10.57 MB)
CZN - Decision Letter and RFD - Independent Tech Review Panel -Aug8-19.pdf (228.67 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
CZN - ASR - Security Acceptance Letter - Phase 1 - Oct17_22.pdf (243.31 KB)
CZN - All Season Road Project - Receipt - Land Use Fees - Feb25-20.pdf (82.83 KB)
CZN - Correspondence Re Land Use Fees - Nov21-19.pdf (127.8 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
CZN - ASR - Draft Permit (MV) - Mar8_21.pdf (513.82 KB)
CZN - Final Security Estimates - Oct3_19.pdf (1.07 MB)
CZN - ITRP Terms of Reference -Sep13-19.pdf (76.59 KB)
CZN - ASR Water Draw Points Table -Sep16-19.pdf (59.39 KB)
CZN - Lakes for Water Withdrawal -Sep16-19.pdf (4.54 MB)
CZN - ASR Water Draw Points -Sep16-19.pdf (16.86 MB)
CZN - Correspond Re Eligibility May5-19.pdf (85.26 KB)
CZN - Independent Tech Review Panel - Staff Report - Aug8_19.pdf (339.81 KB)
CZN - Letter re Sundog Diversion - Apr6_19.pdf (11.29 MB)
CZN - ASR N Liard Map - Mar22_19.pdf (1.58 MB)
CZN - ASR - Preliminary Draft Permit Conditions - Mar15-19.pdf (474.6 KB)
CZN - App 1-2 Access Road Maps 1-10,000 Version 2 - Mar13-19.pdf (74.67 MB)
CZN - Draft Work Plan - Mar12-19.pdf (96.22 KB)
CZN - App 1-6 ASR Design Drawings - Series 600 - Feb20-19.pdf (15.09 MB)
CZN - App 1-6 ASR Design Drawings - Series 700 - Feb20-19.pdf (28.18 MB)
CZN - App 1-6 ASR Design Drawings - Series 900 - Feb20-19.pdf (20.5 MB)
CZN - App 1-7 Stream Crossing General Arrngmt Drawings - Feb20-19.pdf (59.12 MB)
CZN - App 1-11-12 Borrow Pit Information - Feb20-19.pdf (17.31 MB)
CZN - App 1-14 Studies to Date - Feb20-19.pdf (304.96 KB)
CZN - App 2-1 Updated Commitments Table - Feb20-19.pdf (594.67 KB)
CZN - App 5 Draft WMMP and Data Report - Feb20-19.pdf (45.63 MB)
CZN - App 8-1 AIA non-technical summary - Feb20-19.pdf (296.03 KB)
CZN - App 11-1 Draft Road CRP - Feb20-19.pdf (22.87 MB)
CZN - App 13-1 Draft Geochemical Verification Program - Feb20-19.pdf (6.69 MB)
CZN - App 14-1 Draft Sediment Erosion Ctrl Plan - Feb20-19.pdf (19.82 MB)
CZN - App 15-1 Draft Road Operations and Maintenance - Feb20-19.pdf (22.11 MB)
CZN - App 1-1 Access Road Maps 1-150,000 - Feb20-19.pdf (2.01 MB)
CZN - App 1-2 Access Road Maps 1-10000 - Feb20-19.pdf (74.65 MB)
CZN - App 1-5 Non-Typical Winter Road Section Design Drawings - Feb20-19.pdf (42.79 MB)
CZN - App 1-6 ASR Design Drawings - Series 000 - Feb20-19.pdf (36.57 MB)
CZN - App 1-6 ASR Design Drawings - Series 100 - Feb20-19.pdf (28.48 MB)
CZN - App 1-6 ASR Design Drawings - Series 200 - Feb20-19.pdf (20.59 MB)
CZN - App 1-6 ASR Design Drawings - Series 300 - Feb20-19.pdf (29.04 MB)
CZN - App 1-6 ASR Design Drawings - Series 400 - Feb20-19.pdf (25.5 MB)
CZN - App 17-1 Draft Spill Contingency Plan - Feb20-19.pdf (25.16 MB)
CZN - App17-2 Health Safety and ERP - Feb20-19.pdf (45.99 MB)
CZN - App 1-6 ASR Design Drawings - Series 800 - Feb20-19.pdf (26.39 MB)
CZN - App 1-8 Stream Crossing Hydrology Data - Feb20-19.pdf (7.65 MB)
CZN - App 1-9 Summary of Minor Stream Crossings - Feb20-19.pdf (391.26 KB)
CZN - App 1-10 Draft Borrow Pit Mngt an Rec Plan - Feb20-19.pdf (341.45 KB)
CZN - App 1-13 Construction Camp Layout Drawings - Feb20-19.pdf (7.65 MB)
CZN - App 1-15 Hoverbarge Details - Feb20-19.pdf (1.03 MB)
CZN - App 1-16 Liard River Crossing Drawings - Feb20-19.pdf (5.52 MB)
CZN - App 3-1 Candidate CVs - Feb20-19.pdf (3.22 MB)
CZN - App 7 Engagement Records- Letters- Plan - Feb20-19.pdf (2.93 MB)
CZN - App 9 Draft Invasive Species Mngt Plan and Data - Feb20-19.pdf (60.88 MB)
CZN - App 10 Draft Permafrost Mngt Plan and Data - Feb20-19.pdf (51.59 MB)
CZN - App 10-1 Preliminary Geotechnical Report - Feb20-19.pdf (24.1 MB)
CZN - App 12-1 Draft Waste Mngt Plan - Feb20-19.pdf (13.59 MB)
CZN - App 4-1 Draft Traffic Control Plan - Feb20-19.pdf (3.31 MB)
CZN - App 1-3 Draft Road Construction Mngt Plan - Feb20-19.pdf (3.05 MB)
CZN - App 1-4 Draft Land Use Permit - Feb20-19.pdf (459.48 KB)
CZN - App 1-6 ASR Design Drawings - Series 500 - Feb20-19.pdf (34.51 MB)
CZN - App 20 RECLAIM Cost Estimate Non-Federal Lands - Feb20-19.pdf (1.62 MB)
CZN - App 22 Avalanche Hzrd and Safety - Feb20-19.pdf (22.69 MB)
CZN - App 16-1 Draft Explosives Mngt Plan - Feb20-19.pdf (22.13 MB)
CZN - App 27 App.5-1 Draft Rare Plant Mngt Plan and Data - Feb20-19.pdf (39.73 MB)
CZN - Post-EA Information Package - Feb20-19.pdf (3.87 MB)
CZN - Receipt for LUP Application Fee - Apr24-14.pdf (91.74 KB)
CZN - New LUP and WL Application - Apr23-14.pdf (7.14 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
CZN - Letter from NBDB - Nov14_19.pdf (151.55 KB)
MV2014F0013 - CZN - LKFN Letter and CZN Response Re EMA - Nov6_19.pdf (806.56 KB)
CZN - IR Response -Revised Waste Management Plan - Oct16_19.pdf (9.72 MB)
CZN - CIRNAC Response to Information Request Re Security - Oct15_19.pdf (135.05 KB)
CZN - Public Notice - Mar25_19.pdf (2.21 MB)
CZN - Information Request to CZN Re Waste Management Plan - Oct7_19.pdf (190.23 KB)
CZN - All-Season Road - Draft LUP and WL - IFR faxed to Dehcho Distribution List - Aug16-19.pdf (250.22 KB)
CZN - All-Season Road - Independent Technical Review Panel ToR - IFR faxed to Dehcho Dist. List - Sep30-19.pdf (309.83 KB)
CZN - Information Request to CIRNAC Re Security - Oct2_19.pdf (204.74 KB)
CZN - ASR - Draft Permit Conditions Version 2 - Aug8-19.pdf (662.04 KB)
CZN - Correspondence Re-Technical Panel - Jul23-19.pdf (110.68 KB)
CZN - Correspondence Re-Technical Panel - Jul12-19.pdf (375.9 KB)
CZN - Comments and Responses - Initial Application - May15-19.pdf (22.82 MB)
CZN - All-Season Road Project - Extension to Comment Response Deadline Granted - May1-19.pdf (80.61 KB)
CZN - Request for Comment Response Deadline Extension - Apr28_19.pdf (92.24 KB)
CZN - All-Season Road Project - Additional Information Submitted - Comment Deadline Extended - Apr9-19.pdf (103.83 KB)
CZN - ECCC Review Extension Request - Mar15-19.pdf (167.62 KB)
CZN - Review Extension Request - Mar14-19.pdf (416.67 KB)
CZN - Letter of Support - Nahga Dehe Dene Band - May14-14.pdf (73.31 KB)
CZN - Request for Technical Committee meeting - Parks Canada -May5-14.pdf (52.8 KB)
CZN - Request for review and comments on NEW LUP and WL Application - May2-14.pdf (146.98 KB)
Environmental Assessment
Document Received/Sent Uploaded
CZN - Report of Environmental Assessment - All-Weather Road - RFD - MVEIRB - Sep12-17.pdf (4.4 MB)
CZN - Review Board to Minister - Letter to recommend approval of Report of EA - Sep12 -17.pdf (136.74 KB)
CZN - Minister to Review Board - Decision on EA - Oct9-18.pdf (141.26 KB)