GNWT-FIN - MV2014X0009

​The Government of the Northwest Territories (GNWT) Department of Finance proposes to engage a contractor to design, build,
finance, operate and maintain a buried  fibre optic cable system between  the existing fibre-based infrastructure at, or close to, the McGill Lake Microwave Site. approximately 24 km southeast of
the junction of Highway  I  and Highway 7 and the Town of
Inuvik. Northwest Territories. The 17 mm diameter fibre optic cable will be buried in the existing rights-of-way of the Mackenzie Highway (McGill Lake Microwave Site to Wrigley). the Mackenzie
Valley Winter Road (Wrigley to Fort Good Hope) and the Dempster Highway (from KP 258 to Inuvik): and the preferred alignment of the Mackenzie Highway infrastructure corridor between Fort Good
Hopfl and KP 258 of the Dempster Highway south of lnuvik. The cable is proposed to be installed over 2 winter and I summer seasons using standard cable installation techniques. The purpose of the development is to provide a high speed fibre optic communications link to communities along the Mackenzie Valley. replacing the lower-capacity and costlier-to· maintain microwave communications systems currently serving the communities. Please see Section 3.0- ProposedDevelopment in the attached Project  Description Report (PDR) for a detailed description of the
proposed development.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 37 of 37
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2014L1-0003 MV2014X0009 - GNWT Finance - Transboundary Determination - Staff Report - Dec16-14.pdf (129.51 KB)
MV2014L1-0003 MV2014X0009 - GNWT-Finance - Fibre Optics - Request for Ruling - Staff Report and Comments - Aug7-14.pdf (518.87 KB)
MV2014L1-0003 MV2014X0009 - GNWT-Finance - Fibre Optics - General Correspondence - May22-14.pdf (139.78 KB)
MV2014L1-0003 MV2014X0009 - GNWT - Request for additional information -May1-14 .pdf (102.5 KB)
MV2014L1-0003 MV2014X0009 - GNWT - Fibre Optics - Staff report - Section 22 2 b - Apr24-14.pdf (1.79 MB)
MV2014L1-0003 MV2014X0009 - GNWT Finance - Transboundary Determination - Staff Report - Apr24-14.pdf (126.21 KB)
MV2014L1-0003 MV2014X0009 - GNWT- Finance - Comformity review - Additonal information - Project description - Apr8-14.pdf (356.13 KB)
MV2014X0009 - GNWT - Fibre Optics - draft LUP - for review.pdf (166.91 KB)
MV2014L1-0003 MV2014X0009 - GNWT - Fibre Optics - Application Complete Letter - Mar26-14.pdf (114.55 KB)
MV2014X0009 and MV2014L1-0003 - GNWT-Finance - New LUP Application - MV Fibre Optic Link Project - Mar17-14 .pdf (7.96 MB)
MV2014X0009 and MV2014L1-0003 - GNWT-Finance - New Application - Project Description - Mar17-14.pdf (34.44 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2014X0009 MV2014L1-0003 - GNWT - Finance - Reveiwer comments to Applicant - Oct30-14.pdf (837.63 KB)
MV2014X0009 MV2014L1-0003 - GNWT - Finance - Comments on Revised Applicaton - GLUPB - Oct24-14.pdf (790.22 KB)
MV2014X0009 MV2014L1-0003 - GNWT Finance - Fibre Optic - Comments Access Agreement - GDC - Sept18-14.pdf (146.1 KB)
MV2014L1-0003 MV2014X0009 - GNWT- Dept of Finance - Fibre Optics - Request for Ruling - Aug7-14.pdf (141.35 KB)
MV2014X0009 MV2014L1-0003 - GNWT Finance - Response to comments on request for ruling - Jun17-14.pdf (112.97 KB)
MV2014X0009 MV2014L1-0003 - GNWT Finance - Request for comment on Request for Ruling - May29-14.pdf (253.13 KB)
MV2014X0009 MV2014L1-0003 - GNWT Finance - Fibre Optics Project - Request for Decision from the Board - May26-14.pdf (185.92 KB)
MV2014X0009 MV2014L1-0003 - GNWT-Finance - Conformity Determination with RFD - SLUPB - May2-14.pdf (232.04 KB)
MV2014L1-0002 MV2014X0009 - GNWT Finance - Communications with SLUPB - May1-14.pdf (96.91 KB)
MV2014L1-0002 MV2014X0009 - GNWT Finance - Communications with SLUPB - Apr30-14.pdf (80.36 KB)
MV2014L1-0003 MV2014X0009 - GNWT-Finance - Sahtu Land Use Plan Conformity SSI - Apr28-14.pdf (5.01 MB)
MV2014X0009 MV2014L1-0003 - GNWT-Finance - Conformity Comments - GLUPB - Apr14-14.pdf (79.23 KB)
MV2014X0009 MV2014L1-0003 - GNWT-Finance - Response to SLUPB Conformity - Apr15-14.pdf (287.36 KB)
MV2014L1-0003 MV2014X0009 - GNWT-Finance - Comment on Comformity Determination with SLUP - SSI - Apr15-14.pdf (87.09 KB)
MV2014X0009 MV2014L1-0003 - GNWT-FInance - Comments on LUP and WL Application - GSCI - Apr14-14.pdf (119.17 KB)
MV2014L1-0003 MV2014X0009 - GNWT-Finance - Response to MVLWB on Conformity Determination - SLUPB - Apr9-14.pdf (147.99 KB)
MV2014L1-0003 MV2014X0009 - GNWT-Finance - Response on SLUP Conformity Determination - SLUPB - Apr9-14.pdf (321.57 KB)
MV2014X0009 and MV2014L1-0003 - GNWT-Finance - Request for review and comment on New LUP and WL - Apr4-14.pdf (172.68 KB)
MV2014L1-0003 and MV2014X00009 - GNWT-Finance - Notice of referral for a Conformity Determination - SLUP - Apr2-14.pdf (287.67 KB)
MV2014L1-0003 and MV2014X0009 - GNWT - Fibre Optics - Email re conformity check with SLUP - Mar31-14.pdf (102 KB)
MV2014L1-0003 and MV2014X0009 - GNWT - Fibre Optics - Email re conformity check with GLUP - Mar31-14.pdf (94.95 KB)
MV2014L1-0003 MV2014X0009 - GNWT - Fibre Optics - request review of compliance with GLUP - Mar26-14.pdf (144.35 KB)
MV2014L1-0003 MV2014X0009 - GNWT - Fibre Optics - letter to KGDLC on Access - Mar26-14.pdf (142.35 KB)
MV2014L1-0003 MV2014X0009 - GNWT - Fibre Optics - letter to TDLC on Access- Mar26-14.pdf (119.95 KB)
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
MV2014L1-0003 MV2014X0009 - GNWT Finance - Meeting minutes from May 23 2014 - Jun19-14.pdf (83.82 KB)
9. GIS Data
Shapefiles
Document Received/Sent Uploaded
MV2014X0009 and MV2014L1-0003 - GNWT-Fianance - Shapfiles for MV Fiber Optic Link - Mar19-14 .zip (202.3 KB)