Enbridge Pipelines (NW) Inc. - MV2017P0013
Line 21 pipeline replacement (Norman Wells to Zama) near kilometre post (KP) 529 (the project). The project is located near the Mackenzie River, approximately 9 kilometres east of the village of Fort Simpson, in the Dehcho Region of the Northwest Territories.
Note that the pipeline crossing is a segment replacement project for an existing pipeline that is regulated by the National Energy Board (NEB). The replacement segment to be constructed will cross underneath the Mackenzie River at an anticipated depth of 90-110 metres below the river bed. The construction work sites on either side of the river crossing will be above the oridinary high water mark. An application for the project was filed with the NEB on March 10, 2017 and is accessible on the NEBs Public Registry at https://apps.neb-one.gc.ca/REGDOCS/Home/Index.
Associated Water Licence: MV2017L1-0002.Documents
- All Issuances (2)
- Application and Related Docs (22)
- Conceptual Closure and Reclamation Plan (1)
- Consultations - Reviews - Work Plans (33)
- Engagement Plan (5)
- External Authorizations (5)
- Final Plan and Clearance (5)
- Further Study Requested Sec. 22.2.b (3)
- GIS Data (1)
- Inspection Reports (23)
- Operations and Notifications (4)
- Preliminary Screening (5)
- Public Hearing (72)
- Security and Water Use Fees (1)
- Shapefiles (1)
- Spill - Contingency - Emergency Response (1)
- Technical Session (1)
- Waste Management Plan (13)
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 and MV2017L1-0002 - Enbridge Pipelines - Pre-hearing Conference Agenda - Aug25-17.pdf (550.03 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 - Enbridge Pipelines – 10 Day Prior to Completion of Operation Notification - Oct 4_18.pdf (129.2 KB) | ||
MV2017P0013 - Enbridge Pipelines - List of Mud Components Used - Aug 22_18.pdf (22.89 KB) | ||
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spring 2018 Newsletter - Mar 15_18.pdf (3.74 MB) | ||
MV2017P0013 - Enbridge Pipelines NW Inc. - 48 Hour Notification to Start of Operations - March 14_18.pdf (136.35 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge - Line 21 - Notice of additional time to respond - Nov16-17.pdf (110.19 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 - Enbridge Pipelines - Engagement Plan - Approval Letter - Mar15-18.pdf (160.32 KB) | ||
MV2017P0013 - Enbridge Pipelines - Engagement Plan - Staff Report and Comments - Mar15-18.pdf (345.93 KB) | ||
MV2017P0013 - Enbridge Pipelines - Request for comments on Revised Engagement Plan - Feb23-18.pdf (391.85 KB) | ||
MV2017P0013 - Enbridge Pipelines - Engagement Plan V1.2 - Feb 22_18.pdf (224.27 KB) | ||
MV2017P0013 - Enbridge Pipelines - Engagement Plan V1.2 - EMC Support Letter - Feb 23_18.pdf (542.59 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Spill Contingency Plan V.1 - Mar 23_17.pdf (10.75 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Updated GIS Data - Apr 25_17.zip (14.29 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
MV2017P0013 MV2017L1-0002 - Enbridge Pipelines - Zip File - GIS Data - Apr25-17.zip (14.29 KB) |