Skip to main content

Canadian Zinc Corporation - MV2019L8-0002

For the IAB (federal area) portion of the road. 

Construction and use of an all weather road, with creek crossing structures exceeding 5m in width. This Licence is for federal (IAB) Lands from approximately Km156-164. The road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada. 

This Water Licence is accompanied by Permit MV2014F0013 and Water Licence MV2014L8-0006

Please Note: This Water Licence and associated Permit are linked to Parks Canada Land Use Permit PC2014F0013 and Water Licence PC2014L8-0006


Uploaded On or After
Uploaded On or Before
Displaying 101 - 200 of 262
2. Initial/Renewal Application
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
CZN - ASR - 2023 Annual Report - Apr1_24.pdf (14.19 MB)
CZN - ASR - Correspondence that 2022 Annual Report not submitted - Nov30_23.pdf (159.77 KB)
CZN - Annual Report 2021 - Revised - Jul13_22.pdf (101.75 KB)
CZN - 2020 Annual Permit and Licence Report - Staff Report - Jun17_21.pdf (370.24 KB)
CZN - Acknowledgment - 2020 Annual Permit and Licence Report - Jun17-21.pdf (121.15 KB)
CZN - All Season Road Project - Letter Re Annual Report - Mar 23_21.pdf (125.91 KB)
MV2008L2-0002 MV2019L2-0006 MV2014L8-0006 MV2019L8-0002 MV2014F0013 - CZN - Annual Reports - Staff Report and Comments.pdf (1.1 MB)
MV2019L8-0002 - CZN – 2019 Annual Reports - Accepted - Oct9-20.pdf (191.39 KB)
MV2019L8-0002 - CZN - Letter Re 2019 Annual Report - May 21_20.pdf (127.87 KB)
Designs and As-Builts
Document Received/Sent Uploaded
CZN - ASR - As-built Non-Conformity Correspondence - Nov30_23.pdf (150.84 KB)
CZN - ASR - Phase 2 - Mapbook - KM 0-103 - Nov16_23.pdf (13.92 MB)
CZN - ASR - Phase 2 - Mapbook - KM 103-170 - Nov16_23.pdf (11.69 MB)
CZN - ASR - Non-Typical Winter Road As-Built Drawings - July 24_23.pdf (9.16 MB)
CZN - ASR - Winter Road Deactivation Drawings - July 24_23.pdf (11.55 MB)
CZN - ASR - Memo Re Winter Road As-Built and Deactivation Drawings - July 24_23.pdf (8.06 MB)
CZN - ASR - Phase 1 DCP V2.1 - Conformity Confirmation - Jan10_23.pdf (149.87 KB)
CZN - ASR - Phase 1 DCP V2.1 - Dec9_22.pdf (52.38 MB)
CZN - Acknowledgment - Design and Construction Plan v2 - Nov22_22.pdf (202.67 KB)
CZN - ASR - Phase 1 DCP V2 - ITRP Letter - Nov8_22.pdf (168.58 KB)
CZN - ASR - Phase 1 DCP V2 - Nov8_22.pdf (55.79 MB)
CZN - ASR - Phase 1 DCP V2 Appendix B - Nov8_22.pdf (50.96 MB)
CZN - ASR - Phase 1 DCP V2 Liard Ice Bridge Stamped - Nov8_22.pdf (8.06 MB)
CZN - ASR – Acknowledgement - Design and Construction Plan - Oct14_22.pdf (193.08 KB)
CZN - ASR - Winter Road Design and Construction Plan Updated - Aug22_22.pdf (46.83 MB)
CZN - ASR - DCP - ITRP Acceptance Letter for DCP - Aug22_22.pdf (694.04 KB)
CZN - DCP Phase 1 - Version 1 - Correspondence - Jan17_22.pdf (192.02 KB)
CZN - ITRP Acceptance Letter - Detailed Construction Plan - Jan17_22.pdf (676.53 KB)
Inspection Reports
Document Received/Sent Uploaded
CZN - CIRNAC IAB Lands - Inspection Report - Jan18_23.pdf (873.32 KB)
Operations and Notifications
Document Received/Sent Uploaded
CZN - ASR - Winter Road Deactivation Plan - KP 0 to 17 - Mar30_23.pdf (3.85 MB)
CZN - ASR - Winter Road Deactivation Plan - KP 101 to 169 - Mar30_23.pdf (3.82 MB)
CZN - ASR - Winter Road Deactivation Plan - Email Correspondence - Mar29_23.pdf (143.14 KB)
CZN - ASR - Annual Report Submission Date Extension - Mar28_23.pdf (102.89 KB)
CZN - ASR - Request to Change Annual Report Submision Date - Mar17_23.pdf (165.22 KB)
CZN - ASR - Notification - Phase 1 Winter Road Commencement - Oct 5_22.pdf (262.33 KB)
CZN - ASR - Notification of Commencemet Staging Area - Sep20_22.pdf (333.34 KB)
CZN - ASR - Request for Pioneer Winter Road Emergency Approval - Apr5_22.pdf (148.01 KB)
CZN - ASR - Re Pioneer Winter Road Request - Inspector Response - Apr5_22.pdf (199.01 KB)
CZN - ASR - Winter 2021-22 Construction Deferral - Dec20_21.pdf (282.32 KB)
SNP Reports
Document Received/Sent Uploaded
CZN - ASR - SNP Report - January 2024 - Feb15_24.pdf (543.49 KB)
CZN - ASR - SNP Report - April 2023 - Feb13_24.pdf (2.04 MB)
CZN - ASR - SNP Report - July 2023 - Feb13_24.pdf (544.92 KB)
CZN - ASR - SNP Report - August 2023 - Feb13_24.pdf (544.09 KB)
CZN - ASR - SNP Report - September 2023 - Feb13_24.pdf (4.18 MB)
CZN - ASR - SNP Report - October 2023 - Feb13_24.pdf (544.99 KB)
CZN - ASR - SNP Report - Jan 2023 water use - Feb28_23.pdf (4.48 MB)
CZN - ASR - SNP Report - October 2022 - Jan29_24.pdf (165.93 KB)
CZN - ASR - SNP Report - January 2023 - Feb13_24.pdf (2.05 MB)
CZN - ASR - SNP Report - February 2023 - Feb13_24.pdf (2.05 MB)
CZN - ASR - SNP Report - March 2023 - Feb13_24.pdf (2.04 MB)
CZN - ASR - SNP Report - May 2023 - Feb13_24.pdf (2.13 MB)
CZN - ASR - SNP Report - June 2023 - Feb13_24.pdf (3.22 MB)
CZN - ASR - SNP Report - November 2023 - Feb13_24.pdf (544.67 KB)
CZN - ASR - SNP Report - December 2023 - Feb13_24.pdf (545.17 KB)
CZN - Mine and ASR - SNP Analytical Results May-Nov 2023 -Dec18_23.xlsx (245.59 KB)
CZN - ASR - SNP Report Ice Bridge Data - Jan23_23.pdf (6.46 MB)
CZN - ASR - SNP Report - November 2022 - Jan29_24.pdf (165.8 KB)
CZN - ASR - SNP Report - December 2022 - Feb13_24.pdf (2.32 MB)
CZN - ASR - SNP Reports - Response to Conformity Commentnts on 2022 and 2023 SNP Reports - Feb 27_24.pdf (203.27 KB)
CZN - ASR - Correspondence that 2022 SNP Reports not submitted - Nov30_23.pdf (159.77 KB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
CZN ASR Phase 2 Explosives Management Plan - Extension Request - May8_24.pdf (206.9 KB)
CZN - ITRP - Terms of Reference - Dec4_19.pdf (210.91 KB)
CZN ASR – Phase 2 - Explosives Management Plan – V3 - Not Approved - Mar 19_24.pdf (239.32 KB)
CZN ASR – Phase 2 - Explosives Management Plan – Version 3 - Review Comment Table - Mar 19_24.pdf (576.14 KB)
CZN - ASR - Phase 2 ASR - Cultural Heritage Protection Plan - V2.0 - Nov24_23.pdf (36.94 MB)
CZN - ASR - Phase 2 - Explosives Management Plan - Version 3 - Nov14_23.pdf (4.06 MB)
CZN - ASR Project - Correspondence and Documents Re Phase 2 Plans - Apr 20_23.pdf (2.31 MB)
CZN - ASR - Geochemical Verification Program - V2.2 - Staff Conformity - Sep 27_22.pdf (130.36 KB)
CZN - ASR - Explosive Management Plan V2.2 - Staff Conformity - Sep26_22.pdf (132.06 KB)
CZN - ASR - Explosives Management Plan - V2.2 - Sep13_22.pdf (5.94 MB)
CZN - ASR - Geochemical Verification Program - V2.2 - Sep2_22.pdf (10.44 MB)
CZN - ASR – Geochemical Verification Program Version 2.1 - Revisions Required - Mar14_22.pdf (163.37 KB)
CZN - ASR - Permafrost MP V2.1 - March2_22.pdf (34.15 MB)
CZN – ASR – Explosives Management Plan V2.1 - Staff Report and Comments - Feb3_22.pdf (926.63 KB)
CZN – ASR – Resubmission Required - Explosives Management Plan V2.1 - Jan31_22.pdf (149.54 KB)
CZN - Prairie Creek ASR - Geochemical VP V2.1 - Nov2_21.pdf (9.2 MB)
CZN - ASR Project - PCA Board Staff ENR Letter Re Plans - Jul23_21.pdf (994.26 KB)
CZN - ASR Project - List of PWR Plans (Sent to Parks Canada and MVLWB by CZN) - Jul14_21.pdf (66.02 KB)
CZN - Submission Change - Staff Report and Comments - May13-21.pdf (379.94 KB)
MV2019L8-0002 MV2014F0013 MV2014L8-0006 - CZN - ASR Project - CZN Letter Re Plans - Dec18-20.pdf (120.68 KB)
MV2019L8-0002 MV2014F0013 MV2014L8-0006 - CZN - ASR Project - Board Staff Letter Re Plans - Dec15-20.pdf (283.92 KB)
MV2019L8-0002 MV2014L8-0006 - Water Monitoring Plan Version 2 - April2-20.pdf (6.13 MB)
MV2019L8-0002 - CZN - Water Monitoring Plan - Staff Report and Comments - Mar2-20.pdf (1.36 MB)
MV2019L8-0002 - CZN - Explosives Management Plan V2 - Staff Report and Comments - Mar2-20.pdf (1.1 MB)
MV2019L8-0002 - CZN - Sediment and Erosion V2 - Staff Report and Comments - Mar2-20.pdf (1.07 MB)
MV2014L8-0006 MV2019L8-0002 - CZN - Not Approved - Water Monitoring Plan - Mar2-20.pdf (225.19 KB)
MV2014F0013 MV2014L8-0006 MV2019L8-0002 - CZN - Interim Approval - Explosives Management Plan - Mar2-20.pdf (234.4 KB)
MV2014F0013 MV2014L8-0006 MV2019L8-0002 - CZN - Interim Approval - Sediment and Erosion Control Plan - Mar2-20.pdf (211.27 KB)
MV2014F0013 MV2014L8-0006 MV2019L8-0002 - CZN - Interim Approval - Geochemical Verification Program - Feb18-20.pdf (229.07 KB)
MV2014F0013 MV2014L8-0006 MV2019L8-0002 - CZN - Interim Approval - Permafrost Management Plan V2 - Feb18-20.pdf (213.4 KB)
MV2019L8-0002 - CZN - Geochem V2 - Staff Report and Comments - Feb18-20.pdf (2.34 MB)
MV2019L8-0002 - CZN - Permafrost Mngmt Plan V2 - Staff Report and Comments - Feb18-20.pdf (2.39 MB)
MV2019L8-0002 - CZN - All Season Road Project - Geochemical Verification Program - Faxed to Dehcho Distribution - Dec10-19.pdf (388.17 KB)
MV2019L8-0002 - CZN - Water Monitoring Plan - Dec24_19.pdf (11.86 MB)
MV2019L8-0002 - CZN - Explosives Management Plan V2 - Dec23_19.pdf (4.32 MB)
MV2019L8-0002 - CZN - Sediment and Erosion Control Plan V2 - Dec20_19.pdf (5.96 MB)