Teck Metals has proposed to conduct land use operations asssociated with the water treatment in the Pine Point Tailings Impoundment Area (TIA), maintenanace of the dykes, and closure research activities.
This Permit is associated with Teck Metals' Water Licence MV2017L2-0007.