Canadian Zinc Corporation - MV2021D0005
Allied Licence: MV2021L2-0004
To develop a new exploration decline from the existing 880 m level, including pumping, treatment and discharge of water inflows, use of the existing water treatment infrastructure and Polishing Pond, and placement of waste rock on a waste rock pad near the 870 m level portal. Also, the use of water from local sources for surface exploration drilling.
Operation of a mine and mill processing ~2,400 tonnes/day supported by a camp for ~180 personnel during normal operations, and up to 300 personnel during construction. Drilling and blasting underground. Temporary surface storage of tailings, followed by underground backfill. Placement of waste rock in a permanent surface pile. Temporary storage of mill water and groundwater intercepted underground in a storage pond, recycling of mill water and controlled management and release of the intercepted groundwater to the environment.
Documents
- All Issuances (1)
- Application and Related Docs (62)
- Assorted Management Plans (2)
- Conceptual Closure and Reclamation Plan (1)
- Consultations - Reviews - Work Plans (14)
- Engagement Plan (3)
- External Authorizations (1)
- Further Study Requested Sec. 22.2.b (2)
- Interim Closure and Reclamation Plan (2)
- Operations and Notifications (1)
- Preliminary Screening (7)
- Progressive Reclamation (1)
- Public Hearing (24)
- Security and Water Use Fees (6)
- Shapefiles (1)
- Spill - Contingency - Emergency Response (1)
- Technical Session (11)
- Waste Management Plan (1)
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Technical Session - ECCC Response to IR5 - Oct4_21.pdf (259.57 KB) | ||
CZN - Technical Session - Responses to IRs - Sep20_21.pdf (10.69 MB) | ||
CZN - Technical Session - CZN Extension Request for IR Responses - Sept17_21.pdf (165.17 KB) | ||
CZN - Technical Session - Transcript Day 1 (Aug.31) - Sep9_21.pdf (1.9 MB) | ||
CZN - Technical Session - Transcript Day 2 (Sept.1) - Sep9_21.pdf (1.84 MB) | ||
CZN - Technical Session - Transcript Day 3 (Sept.3) - Sep9_21.pdf (1.7 MB) | ||
CZN - Technical Session - Information Request ECCC - Sept 7_21.pdf (180.91 KB) | ||
CZN - Technical Session - Information Requests - Sept 7_21.pdf (266.4 KB) | ||
CZN - Technical Session - Correspondence Re Eligibility - Sept 2_21.pdf (238.1 KB) | ||
CZN - Technical Session Presentation - Aug31_21.pdf (32.51 MB) | ||
CZN - Technical Session Agenda Aug 3- Sept 2 - Aug 27_21.pdf (337.31 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - 2024 Site Opening Notification - Mar15_24.pdf (104.85 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Annual Management Plan Review - 2024 - March12_24.pdf (155.96 KB) | ||
CZN - Type A Licence and Permit - Submission Requirements - Oct17_22.pdf (143.68 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – Approved - Engagement Plan V2 - Apr26_23.pdf (183.24 KB) | ||
CZN - Engagement Plan - Version 2 - Mar 2_23.pdf (1.16 MB) | ||
CZN - Mineral Exploration - EP V1 - July 21-20.pdf (1.63 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - SCP V2 - Sept23-20.pdf (9.25 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Mineral Exploration - WMP V2 - Aug18-20.pdf (859.27 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Closure and Reclamation - Work Plan V1 - Mar12_24.pdf (409.33 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN – Closure and Reclamation Plan V2 - Review Comments and Responses - Jun5_23.pdf (597.97 KB) | ||
CZN – Deferral - Closure and Reclamation Plan - Version 2 - May17_23.pdf (172.11 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - 2024 Progressive Reclamation - Notification - None Occurring - Mar12_24.pdf (118.39 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - Type A Licence and Permit Application - GIS Shapefiles Prairie Creek - May27_21.zip (507.32 KB) |