Ka'a' Gee Tu First Nation - MV2021X0014
Status:
Issued
Authorization:
Land Use Permit
Activity:
Miscellaneous
Start:
September 7, 2021
Expiry:
September 6, 2026
Staff:
Tyree Mullaney
Using ballast rock to upgrade the exsisting break water system in the Kakisa River to create an area to establish a safe boat launch and floating dock system.
No water licence is required.
Displaying 1 - 15 of 15
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
KTFN – Breakwater Upgrade – Type A Land Use Permit - Issuance - Sep7_21.pdf (697.72 KB) | ||
Ka ‘a’ Gee Tu First Nation – Breakwater Upgrades – Issuance - Staff Report and Comments - Aug25_21.pdf (837.75 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
KTFN - Breakwater Upgrades - Receipt - Application Fee - Jul20_21.pdf (36.53 KB) | ||
KTFN - Breakwater Upgrade - 2021 Capital Motion - Jul12_214.pdf (91.69 KB) | ||
KTFN - Breakwater Upgrade - Capital Plan 2021-2022 - Jul12_21.xlsx (97.18 KB) | ||
KTFN - Breakwater Upgrades - Incomplete Letter - July9_21.pdf (211.74 KB) | ||
KTFN - Breakwater Upgrades - Application Form - Jul5_21.pdf (1.79 MB) | ||
KTFN - Breakwater Upgrades - Spill Contingency Plan - Jul6_21.docx (1.33 MB) | ||
KTFN - Breakwater Upgrades - Waste Management Plan - Jul6_21.docx (392.1 KB) | ||
KTFN - Breakwater Upgrades - Map 1 - Jul5_21.jpg (185.12 KB) | ||
KTFN - Breakwater Upgrades - DFO Letter - Jul5_21.pdf (235.56 KB) | ||
KTFN - Breakwater Upgrades - Map 2 - Jul5_21.jpg (172.66 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
KTFN - Breakwater Upgrade - Draft Conditions - Jul13_21.docx (639.49 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
KTFN - Notification - Preliminary Screening Determination - Aug25_21.pdf (164.32 KB) | ||
KTFN - Preliminary Screening Determination and Reasons for Decision - Aug25_21.pdf (255.55 KB) |