Northwest Territories Power Corporation - MV2022I0013

Taltson Hydroelectric Facility Transmission Line - Brushing and maintenance of the existing right of way for the transmission lines from the Taltson Hydroelectric Facility to Pine Point, Fort Resolution, and Fort Smith. Use of equipment. Drilling to identify the main cause(s) of anchor degradation along the Transmission Line.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 23 of 23
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
NTPC - Taltson Powerline - Issuance - Type A Land Use Permit - Nov8_22.pdf (954.93 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
NTPC - Taltson - Engagement Log - Sept19_22.pdf (2.28 MB)
NTPC - Taltson - Spill Contingency Plan V1.1 - Sept19_22.pdf (2.22 MB)
NTPC - Taltson - Erosion and Sediment Control Plan - Sept19_22.pdf.pdf (379.98 KB)
NTPC - Taltson - Wildlife Avoidance and Mitigation - Sept19_22.pdf.pdf (576.82 KB)
NTPC - Taltson - New Type A LUP Application - Sep19_22.pdf (5.86 MB)
NTPC - Taltson - Engagement Plan - Sept19_22.pdf (321.96 KB)
NTPC - Taltson - Waste Management Plan V1.1 - Sept19_22.pdf.pdf (11.16 MB)
Draft Conditions.pdf (322.02 KB)
NTPC - New Permit Application - Incomplete - Sept12_22.pdf (191.74 KB)
NTPC - Taltson - Application - Engagement Log - Sep7_22.pdf (2.1 MB)
NTPC - Taltson - Waste Management Plan V.11 - Sep7_22.pdf (11.01 MB)
NTPC - Taltson - Wildlife Avoidance and Mitigation Plan - Sep7_22.pdf (576.82 KB)
NTPC - Taltson - Application - Figures L150 Re-Anchor Study - Sep7_22.pdf (4.06 MB)
NTPC - Taltson - New Type A LUP Application - Sep7_22.pdf (1.5 MB)
NTPC - Taltson - Engagement Plan - Sep7_22.pdf (320.31 KB)
NTPC - Taltson - Spill Contingency Plan - V.11 - Sep7_22.pdf (2.39 MB)
NTPC - Taltson - Erosion and Sediment Control Plan - Sep7_22.pdf (372.32 KB)
Preliminary Screening
Document Received/Sent Uploaded
NTPC – Taltson Powerline - Notification - Preliminary Screening Determination - Oct28_22.pdf (500.95 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
NTPC - Taltson Powerline - Inspection Report - January 11, 2023 - Jan27_23.pdf (1.58 MB)
Operations and Notifications
Document Received/Sent Uploaded
NTPC - Taltson Powerline - Phase 2 Notification - Borehole Locations - Jan11_23.pdf (3.25 MB)
NTPC - Taltson Powerline - Phase 1 Notification - Anchor Excavation Locations - Jan11_23.pdf (2.51 MB)
NTPC- Taltson Powerline Maintenance - Start Up Notification - Dec9_22.pdf (243.92 KB)