GNWT-INF - MV2023L8-0012

​The Department of Infrastructure (INF) is planning to replace two existing culverts at km 139.8 (dia. 800 mm) and km 140.3 (dia. 1000 mm), install a new culvert at km 140.7 (dia. 800 mm) and place fill into the water between km 139.4 -141 to bring road grade to design height. The land use activities will fall under the Highway 3 Land Use Permit MV2017X0008 (Hwy 3 Km 124-338.8). I


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
GNWT - INF - Notification - Preliminary Screening Determination and RFD - Mar 6_24.pdf (426.61 KB)