CIRNAC-CARD - MV2023X0014
Status:
Issued
Authorization:
Land Use Permit
Activity:
Miscellaneous
Start:
July 7, 2023
Expiry:
July 6, 2028
Staff:
Tyree Mullaney
Remediation work of the former O'Connor Lake mine approximately 100km east of Fort Resolution. The site is located on Federal land.
Activities include: Sealing an open mine shaft, demolishing the headframe and site buildings and removing associated hazardous materials, installing groundwater monitoring wells, and removing all materials and equipment from site upon completion.
A camp will be utilized.
Slave Lake Zinc currently holds a Type A Land Use Permit (MV2016C0037) and Type B Water License (MV2021L8-0008) in the same location, but activities are separate to the activities under this Permit.
Documents
Displaying 1 - 21 of 21
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
O’Connor – Issuance - Type A Land Use Permit - Jul7_23.pdf (968.37 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
O'Connon - Closure and Reclamation Plan - May4_23.pdf (34.52 MB) | ||
O'Conner - Draft Conditions - May12_23.pdf (321.55 KB) | ||
O'Connor - Maps - May11_23.pdf (9.65 MB) | ||
O'Connor - Application - Cover Letter - May4_23.pdf (177.28 KB) | ||
O'Connor - Spill Contingency Plan - May4_23.pdf (3.66 MB) | ||
O'Connor - Waste Management Plan - May4_23.pdf (2.14 MB) | ||
O'Connor - Application - May4_23.pdf (571.54 KB) | ||
O'Connor - Engagement Plan - May4_23.pdf (974.85 KB) | ||
O'Connor - Engagement Log - May8_23.pdf (837.62 KB) | ||
O'Connor - Sediment and Erosion Control Plan - May8_23.pdf (8.76 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
O’Connor Lake – Notification - Preliminary Screening Determination - Jun26_23.pdf (501.67 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
O'Connor - Notification - Demobilization Complete - Sept 25_24.pdf (49.68 KB) | ||
O'Connor - Request for Plan Submission Extension and Board Staff Response - Jul26_23.pdf (89.49 KB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
O'Connor - Erosion and Sediment Control - V1.1 - Dec29_23.pdf (40.92 MB) | ||
O'Connor - Erosion and Sediment Control - V1.1 - Board Staff Conformity - Jan3_24.pdf (148.77 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
O'Connor - Spill Contingency Plan - V1.1 - Dec29_23.pdf (48.04 MB) | ||
O'Connor - Spill Contingency Plan - V1.1 - Board Staff Conformity - Jan3_24.pdf (148.31 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
O'Connor - Waste Management Plan - V1.1 - Dec29_23.pdf (7.6 MB) | ||
O'Connor - Waste Management Plan - V1.1 - Board Staff Conformity - Jan3_24.pdf (148.35 KB) |
9. GIS Data
Document | Received/Sent | Uploaded |
---|---|---|
O'Connor - GIS Data - May11_23.zip (16.96 KB) |