Skip to main content

GNWT-INF - MV2023X0029

​For the construction of a transmission line to connect Dory Point and the communities of Fort Providence and Kakisa to the Taltso Hydroelectric system at an interconnnection point near Hay River.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 12 of 12
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GNWT - INF - Transmissin Line - GNWT Highway Access Authority - Nov17_23.pdf (44.43 KB)
GNWT-INF - Draft Conditions - MVLWB - Oct10_23.pdf (307.53 KB)
GNWT - INF - Transmission Line - Erosion and Sediment Control Plan - Oct3_23.pdf (5.15 MB)
GNWT - INF - Transmission Line - Engagement Plan - Oct3_23.pdf (2.06 MB)
GNWT - INF - Transmission Line - Cover Letter - Application Cover Letter - Oct3_23.pdf (361.17 KB)
GNWT - INF - Transmission Line - Bird Protection Plan - Oct3_23.pdf (8.7 MB)
GNWT - INF - Transmission Line - Application Form - Oct3_23.pdf (683.37 KB)
GNWT- INF - Transmission Line - Project Description Report - Oct3_23.pdf (5.23 MB)
GNWT - INF - Transmission Line - Wildlife Management and Monitoring Plan - Oct3_23.pdf (7.13 MB)
GNWT - INF - Transmission Line - Waste Management Plan - Oct3_23.pdf (4.8 MB)
GNWT - INF - Transmission Line - Spill Contingency Plan - Oct3_23.pdf (6.7 MB)
GNWT - INF - Transmission Line - Proponent Drafted Permit Draft Conditions - Oct3_23.pdf (932.52 KB)