Skip to main content

GNWT-INF - MV2023X0029

​For the construction of a transmission line to connect Dory Point and the communities of Fort Providence and Kakisa to the Taltso Hydroelectric system at an interconnnection point near Hay River.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
GNWT–INF – Transmission Line - Notification - Preliminary Screening Determination - Dec 1_23.pdf (461.59 KB)