N7L2-1645 - Diavik - Comprehensive Study Report - Jun 1999.pdf (1.2 MB)
June 1, 1999
November 21, 2018
N7L2-1645 - Diavik - 2001 A154 Dike Monitoring Report - Nov 1_01.pdf (14.68 MB)
October 31, 2001
November 9, 2015
N7L2-1645 - Diavik - Special Effects Studies - Status Report - Sep 30_04.pdf (438.21 KB)
September 29, 2004
May 14, 2015
PKC QAQCPlan- comments.pdf (170.85 KB)
June 8, 2008
N7L2-1645-CEMP-INAC requests extn- Jul07.pdf (12.58 KB)
January 15, 2008
N7L2-1645-CEMP-A21-RevCom-DFO-Jul07.pdf (13.1 KB)
January 15, 2008
N7L2-1645-SRpt-CEMP-A21Causeway-Aug9-10-Aug07.pdf (1 MB)
January 15, 2008
N7L2-1645- A21- DDMIs Additiontional Info Provided By BGC Engineering- EM From INAC- Nov15-07.pdf (12.76 KB)
November 21, 2007
N7L2-1645- A21 Dike Submission - Comment Summary With Response - Oct26-07.pdf (540.24 KB)
October 25, 2007
N7L2-1645-A21 Dike And Pit Design- Review Comments From INAC- Oct15-07.pdf (1.29 MB)
October 14, 2007
N7L2-1645- A21-South Island Excavation- Oct9-07.pdf (574.22 KB)
October 8, 2007
N7L2-1645-A21 Dike And Mine-Review Comments From-ENR-Email-Oct07.pdf (86.12 KB)
October 3, 2007
Approval - A21 Hydrogeological Characterization Plan.pdf (195.46 KB)
September 26, 2007
N7L2-1645-A21 HydroGeo Plan ApprovalSep27-Sep07.pdf (74.84 KB)
September 26, 2007
A21-TechSpecs.pdf (1.09 MB)
August 30, 2007
QAQC-A21-Aug07.pdf (742.39 KB)
August 30, 2007
APPENDIX A_Golder SI Report_FINAL.pdf (12.45 MB)
August 30, 2007
APPENDIX B - 362 16Aug 07 RPT-Ver0 A21 Data Report.pdf (4.58 MB)
August 30, 2007
APPENDIX C_stability analyses.pdf (3.25 MB)
August 30, 2007
APPENDIX D - Seepage Analyses_FINAL.pdf (5.26 MB)
August 30, 2007
APPENDIX E Deformation Analyses.pdf (7.61 MB)
August 30, 2007
Appendix F - Hydrologic Analyses.pdf (225.17 KB)
August 30, 2007
Appendix G - Thermal Analyses.pdf (5.06 MB)
August 30, 2007
A21 Dike Design Report _ Aug 07 _ v1.pdf (10.21 MB)
August 30, 2007
A21FinalPitDesign-Aug07.pdf (1.08 MB)
August 30, 2007
A21FinalPitDesign-toc.doc (64 KB)
August 30, 2007
Appendix I.pdf (9.12 MB)
August 30, 2007
Appendix II.pdf (9.12 MB)
August 30, 2007
Appendix III part 1.pdf (9.84 MB)
August 30, 2007
Appendix III part 2.pdf (11.57 MB)
August 30, 2007
Appendix IV part 1.pdf (9.35 MB)
August 30, 2007
Appendix IV part 2.pdf (21.42 MB)
August 30, 2007
APPENDIX V.pdf (8.23 MB)
August 30, 2007
APPENDIX VI.pdf (7.64 MB)
August 30, 2007
Figures-pt1.pdf (22.34 MB)
August 30, 2007
Figures-pt2.pdf (12.33 MB)
August 30, 2007
A21DikeCEMP_15Aug07.pdf (12.42 MB)
August 14, 2007
N7L2-1645-A21 Causeway Construction Environmental Management Plan - Approval-Fax-Aug10-07.pdf (2.04 MB)
August 9, 2007
N7L2-1645- A21 Causeway Construction Environmental Management Plan -Approval-Aug10-07.pdf (385.97 KB)
August 9, 2007
Extension Granted - A21 Hydrogeological Reviews.pdf (838.49 KB)
July 30, 2007
N7L2-1645-RevReq-A21HydrogeologicalPlan-CausewayEMPSubmissions-Dist-Jul07.pdf (1.39 MB)
July 29, 2007
N7L2-1645-RevReqSubmissions-A21HCP-Causeway-CovForSubmissions-Dist-Jul07.pdf (4.12 MB)
July 29, 2007
N7L2-1645-ExtnApr-A21HydrogeologicalCharPlan-CommentsdueByAug10-Dist-Jul07.pdf (829.13 KB)
July 29, 2007
N7L2-1645-A21ConstructionEnvironmentalManagementPlan-A21CausewaySubmission-LtrOfRecJul6-07-Jul07.pdf (49.04 KB)
July 5, 2007
A21 Hydrogeological Characterization Plan - Acknowledgement.pdf (11.21 KB)
June 30, 2007
PlumeDelineation-Appx.pdf (1.46 MB)
June 29, 2007
A418DikeDesignRreportVolume1.pdf (4.6 MB)
June 29, 2007
7-let1230GroundwaterInflowinvestigations.pdf (2.63 MB)
June 29, 2007
A418DikeTurbidity-Appx1-2.pdf (5.38 MB)
June 29, 2007
A418DikeTurbidity.pdf (9.5 MB)
June 29, 2007
A418DikeTurbidity-Appx2-6.pdf (27.21 MB)
June 29, 2007
N7L2-1645-PKC-RecOfDesignDrawingsPhV-LrtJun26-07.pdf (42.55 KB)
June 25, 2007
PKC-RecOfDesignDrawingsPhV-LrtJun26-07.pdf (42.55 KB)
June 25, 2007
A21 Construction Environmental Management Plan.pdf (3.9 MB)
June 24, 2007
A21-HydrogeologicalCharacterizationPlan-Jun07.pdf (208.07 KB)
June 24, 2007
N7L2-1645-A21HydrogeologicalCharacterizationPlan-RecOfPlan-LtrJun25-07-Jul07.pdf (48.59 KB)
June 24, 2007
xxN7L2-1645-OPCP-HMMP-DDMIsChangesToRevisedPlans-CommentsDueByJul16-07-Dist-Jul07.pdf (23.89 KB)
June 21, 2007
A154DIKE2006-Jan07.pdf (10.35 MB)
January 30, 2007
A418-DewateringProgram-29-12-06.pdf (3.18 MB)
December 28, 2006
GLLReportReviews-Sep26-06.pdf (127.07 KB)
September 25, 2006
MV05L2-09-A418Dewatering-Aug06.pdf (54.22 KB)
August 29, 2006
N7L2-1645-Ltr-L8-RestorationMonitoringPlan-Jan06.pdf (1.7 MB)
January 30, 2006
xxN1L2-1645-EMcov-PlumeDelineationRptAndAmmoniaFateStudyRpt-Nov05.pdf (81.77 KB)
November 29, 2005
N7L2-1645-PlumeDelineationRpt-Nov05.pdf (13.12 MB)
November 29, 2005
PlumeRpt-RelatedDocsNov05.pdf (388.92 KB)
November 29, 2005
xxN7L1-1645-EMAT-EPAQualityAssuranceProjectPlan-DataObjectivesProcessRpts-Nov05.pdf (45.62 KB)
November 29, 2005
xxN7L2-1645-CovLtr-AnnualGeoInspRpts-Nov05.pdf (81.76 KB)
November 29, 2005
N7L2-1645-EMAT-TargetAnalytes-SedimentChemistry-Nov05.pdf (92.55 KB)
November 3, 2005
N7L2-1645-EMAT-Gll-Rev-SES-K74-Oct05.pdf (495.94 KB)
October 30, 2005
N7L2-1645-Ltr-GeotechRpt-A154DikeAndNorthInletEast-Oct05.pdf (10.33 MB)
October 30, 2005
ccN7L2-1645-DDMIResponseToGartnerLeeRevComSpecialEffects-Jul05.pdf (537.54 KB)
July 30, 2005
N7L2-1645-EM-SESReviewPartKItem7ii-Jul05.pdf (628.86 KB)
July 30, 2005
N7L2-1645-H-19-StatusRpt2-Jul05.pdf (112.57 KB)
July 30, 2005
N7L2-1645-Ltr-HyalellaAztecaTestMethodComments-Jul05.pdf (348.98 KB)
July 30, 2005
xxN7L2-1645-FAX-BoardLtr-BaselineDatabase-TSSInvestigations-Jun05.pdf (166.97 KB)
June 29, 2005
ccN7L2-1645-EM-MVLWBReviewofReports-June05.pdf (177.5 KB)
May 31, 2005
xxN7L2-1645-FaxToLKFN-AEMP-ConPlan-SOPAcidSystem-May05.pdf (955.16 KB)
May 30, 2005
N7L2-1645-DewateringPlan-May05.pdf (152.52 KB)
May 30, 2005
xxN7L2-1645-EM-RequesttoAdd2004AnnRptAndAEMPtoMeeting-May05.pdf (15.4 KB)
May 30, 2005
N7L2-1645-EM-ToxicityTestResultscomments-Apr05.pdf (15.65 KB)
April 29, 2005
N7L2-1635-EM-StatusRpt-Rev-Mar05.pdf (16.01 KB)
March 30, 2005
PKC Phase3-AsBuilt-Drawings-Mar05.pdf (9.06 MB)
March 30, 2005
PKC Phase3 AsBuilt-Mar3-05.pdf (1.25 MB)
March 30, 2005
N7L2-1645-Ltr-AprofA418Construction-Feb05.pdf (239.15 KB)
February 27, 2005
N7L2-1645-Ltr-ReceiptofStatusRpt1-Feb05.pdf (227.8 KB)
February 27, 2005
xxN7L2-1645-EM-DDMIRespA418Sub-Feb05.pdf (265.25 KB)
February 27, 2005
xxN7L2-1645-EM-DDMI-SubmissionsStatus-Limn-SES-Ammonia-Nov05.pdf (46.42 KB)
February 27, 2005
xxN7L2-1645-EM-PartHItem14SOPAcidSystem-feb05.pdf (84.16 KB)
February 27, 2005
Construction Environmental Monitoring Plan-INAC Review-Jan05.pdf (98.29 KB)
January 30, 2005
N7L2-1645-EM-DIANDcomments418-Jan05.pdf (687.38 KB)
January 30, 2005
N7L2-1645-LTR-ToxicityResults-Jan05.pdf (1.02 MB)
January 30, 2005
N7L2-1645-SR-2-Jan05.pdf (243.24 KB)
January 30, 2005
A418GroundwaterCharacterizationandFractureZoneV1.pdf (198.24 KB)
November 10, 2004
Diavik Geotechnical Review Board Meeting Jun28-Jul1 2004 - Report 1A - Review of A418 Dyke.pdf (67.27 KB)
June 30, 2004