Canadian Zinc Corporation - PC2014L8-0006
Status:
Issued
Authorization:
Licence
Activity:
Miscellaneous
Start:
November 22, 2019
Expiry:
November 21, 2029
Staff:
Andrew Wheeler
Construction and use of an all weather road, with creek crossing structures exceeding 5m in width. Road crosses federal (IAB) Lands from approximately Km156-164. Road crosses the Nahanni National Park Reserve from approximately Km17-100 where the jurisdiction is Parks Canada.
This Water Licence is accompanied by Permit PC2014F0013
Please Note: This Water Licence and associated Permit are linked to the Mackenzie Valley Land and Water Board Land Use Permit MV2014F0013, Water Licence MV2014L8-0006 and Water Licence MV2019L8-0002
Documents
- AEMP - Annual Report (1)
- All Issuances (7)
- Application and Related Docs (54)
- Assorted Management Plans (31)
- Conceptual Closure and Reclamation Plan (10)
- Consultations - Reviews - Work Plans (19)
- Designs and As-Builts (13)
- Engagement Plan (5)
- Environmental Assessment (4)
- Final Plan and Clearance (2)
- Inspection Reports (32)
- Operations and Notifications (30)
- Other (4)
- Other Monitoring Program (3)
- Preliminary Screening (3)
- Security and Water Use Fees (1)
- Sediment and Erosion Control (3)
- Shapefiles (1)
- SNP Reports (25)
- Spill - Contingency - Emergency Response (6)
- Technical Session (11)
- Waste Management Plan (5)
- Water Management (6)
- WEMP - Wildlife Effects Monitoring Program (8)
Displaying 101 - 200 of 284
3. Amendment Application
Document | Received/Sent | Uploaded |
---|---|---|
MV2014L8-0006 PC2014L8-0006 - CZN - Engagement - LKFN Letter of Support for Permit Applications - Apr-28_20.pdf (550.45 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - Phase 2 - Mapbook - KM 0-103 - Nov16_23.pdf (13.92 MB) | ||
CZN - ASR - Phase 2 - Mapbook - KM 103-170 - Nov16_23.pdf (11.69 MB) | ||
CZN - ASR - As Built Construction 25.5 to 27.0 - Mar 7_23.pdf (11.1 MB) | ||
CZN Design Phase 1 Correspondence - PC Requirements - Dec1_22.pdf (188.75 KB) | ||
CZN DCP Phase 1 - Updated - Oct28_22.pdf (49.09 MB) | ||
CZN DCP Phase 1 - Updated - Parks Approval - Oct31_22.pdf (709.22 KB) | ||
CZN DCP Phase 1 Appendix B - Updated - Oct28_22.pdf (50.96 MB) | ||
CZN DCP Phase 1 CZN Response to Directives - Nov8_22_.pdf (181.89 KB) | ||
CZN DCP Phase 1 Directive Correspondence - Nov10_22_.pdf (192.21 KB) | ||
CZN - ASR - ICRP - ITRP Acceptance Letter for DCP - Aug22_22.pdf (694.04 KB) | ||
CZN - ASR - Winter Road Design and Construction Plan Updated - Aug22_22.pdf (46.83 MB) | ||
CZN - DCP Phase 1 - Version 1 - Correspondence - Jan17_22.pdf (192.02 KB) | ||
CZN - ITRP Acceptance Letter - Detailed Construction Plan - Jan17_22.pdf (676.53 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
CZN - ASR - CZN Geotechnical Investigation Report Phase 1 - June 22_23.pdf (2.29 MB) | ||
CZN - ASR - Parks Canada Review of Geotechnical Investigation Report - June 23_23.pdf (663.96 KB) | ||
CZN - ASR - Updated Slope Stability Analysis - Mar 27_23.pdf (2.68 MB) |