Skip to main content

GNWT-INF (Sahtu) - S03L8-003

The GNWT-DOT plans to build a bridge crossing Jungle Ridge Creek at km 978.5 along the Mackenzie Valley Winter Road.
Uploaded On or After
Uploaded On or Before
Displaying 1 - 13 of 13
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
S03L8-003 - SLWB Response to 2007 Annual Report - Apr 16_09.pdf (219.98 KB)
S03L8-003 - 2007 Annual Report - Nov 24_08.pdf (33.83 KB)
S03L8-003 - 2006 Annual Report - May 30_07.pdf (61.62 KB)
S03L8-003 - 2005 Annual Report - Jan 20_06.pdf (59.75 KB)
S03L8-003 - SLWB Response to 2004 Annual Report - Revised - Nov 02_05.pdf (159.15 KB)
S03L8-003 - 2004 Annual Report - Revised - Nov 17_05.pdf (138.69 KB)
S03L8-003 - 2004 Annual Report - Oct 06_05.pdf (62.5 KB)
S03L8-003 - 2003 Annual Report - Sep 26_05.pdf (58.44 KB)
S03L8-003 - Summary of 2003 Annual Report for MV Winter Road Bridge Program - Aug 05_04.pdf (161.88 KB)
Designs and As-Builts
Document Received/Sent Uploaded
S03L8-003 - Final Bridge Plans - Jun 03_08.pdf (181.32 KB)
Inspection Reports
Document Received/Sent Uploaded
S03L8-003 - Water Use Inspection - Sep 22_10.pdf (95.65 KB)
S03L8-003 - Archaeological Inspection for ECE - Mar 10_05.pdf (196.04 KB)
Operations and Notifications
Document Received/Sent Uploaded
S03L8-003 - Violation of Water Licence - Unapproved Quarring of Fill Materials - Feb 12_04.pdf (163.98 KB)