Skip to main content

GNWT-INF (Sahtu) - S04L8-017

The project consists of a permanent bridge installationg at Big Smith Creek located at km 871.1 along the Mackenzie Valley Winter Road.
Associated LUP: S04E-014​

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
S04L8-017 - Preliminary Screening - Feb 15_06.pdf (375.48 KB)