MGM Energy - S12L1-001
Status:
Expired
Authorization:
Licence
Activity:
Industrial
Start:
July 23, 2012
Expiry:
July 22, 2017
Staff:
Bonnie Bergsma
Type B Water Licence to MGM Energy Corp for exploratory oil and gas drilling 7 to 15 km south of Tulita. Associated Land Use Permit is S12A-001.
Click here to see map
Click here to see map
Documents
- All Issuances (3)
- Annual Reports (9)
- Application and Related Docs (39)
- Assignments (2)
- Consultations - Reviews - Work Plans (34)
- Designs and As-Builts (1)
- Inspection Reports (4)
- Operations and Notifications (7)
- Preliminary Screening (1)
- Progress Reports (2)
- Security and Water Use Fees (4)
- Shapefiles (4)
- SNP Reports (37)
- Spill Reports (3)
Displaying 1 - 100 of 150
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
S12L1-001 - Name Change to MGM Energy - Feb 15_16.pdf (487.57 KB) | ||
S12L1-001 - Water Licence - July 24_12.pdf (4.57 MB) | ||
S12L1-001 - Further Study Requested - Jun-15_12.pdf (3.22 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S12L1-001 - Assignment Application - Dec 21_15.pdf (50.74 KB) | ||
S12L1-001 - Assignment Application Fee - Dec 21_15.pdf (51.81 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S12L1-001 - Water Use Fees 2013-2014 - Nov 27_15.pdf (48.46 KB) | ||
S12L1-001 - Water Use Fees 2012-2013 - Nov 09_12.pdf (297.71 KB) | ||
S12L1-001 - Security Deposit Confirmation - Aug 24_12.pdf (308.69 KB) | ||
S12L1-001 - Water Use Fees Requirements - July 25_12.pdf (1.81 MB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S12L1-001 - Preliminary Screening - July 24_12.pdf (225.35 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S12L1-001 - As-Built Wellsite I-78 Schematics - Apr 04_13.pdf (497.73 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S12L1-001 - Inspection Report - Oct 22_13.pdf (2.87 MB) | ||
S12L1-001 - Inspection Report - Mar 14_13.pdf (311.06 KB) | ||
S12L1-001 - Inspection Report - Dec 20_12.pdf (298.88 KB) | ||
S12L1-001 - Inspection Report - Nov 28_12.pdf (131.37 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S12L1-001 - Wildlife Mapping 2012-2013 - May 07_13.pdf (2.02 MB) | ||
S12L1-001 - Final Drilling Mud Chemical List - Apr 25_13.pdf (96 KB) | ||
S12L1-001 - MGM-Shell East Mackay I-78 - Frac Fluid Chemical Disclosure - Apr 04_13.pdf (70.27 KB) |