Skip to main content

CIRNAC-CARD - S17D-003

​​The renewal of Permit S09D-001 for the Great Bear Lake Remediation project encompassing Silver Bear Mines (including Terra, Northrim, Norex, Graham Vein and Smallwood Mines), El Bonanza Mines (including El Bonanza and Bonanza), Contact Lake Mine and Sawmill Bay Mine. The remediation project will restore these abandoned sites to their original state as much as possible. Associated Water Licence is S17L8-002 (renewal of S15L8-001, S09L8-001 original issuance). Two year extension granted with new expiry July 24, 2024

Uploaded On or After
Uploaded On or Before
Displaying 1 - 51 of 51
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
S17D-003 - CIRNAC- CARD - Land Use Permit Extension - Dec 13_22.pdf (737.87 KB)
S17D-003 - INAC-CARD - Land Use Permit - Jul 13_17.pdf (312.22 KB)
S17D-003 - INAC-CARD - Issuance Letter - Jul 13_17.pdf (55.09 KB)
S17D-003 - INAC-CARD - Reasons for Decision - Jul 13_17.pdf (53.66 KB)
Final Plan and Clearance
Document Received/Sent Uploaded
S17D-003 - CIRNAC-CARD - In Preparation for Expiry - May17_22.pdf (213.01 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S17D-003 - CIRNAC-CARD - Name Change Notification to SLWB - Jan_21_20.pdf (42.19 KB)
S17D-003 - INAC-CARD - Staff Report 1 - Jul 9_17.pdf (994.9 KB)
S17D-003 - INAC-CARD - Draft LUP - Jun 12_17.pdf (644.24 KB)
S17D-003 - GBL LUP - Annex A6 - 2010 Completion Report - GBL Sites Phase 1 Remediation - May 26_17.PDF (24.85 MB)
S17D-003 - GBL LUP - Annex A7 - 2011 Completion Report - GBL Sites Phase 1 Remediation - May 26_17.PDF (26.43 MB)
S17D-003 - GBL LUP - Appendix B - GBL Site Maps - May 26_17.PDF (14.2 MB)
S17D-003 - GBL LUP - Appendix J - Proposed Mitigation Measures for Barge and Winter Road - May 26_17.PDF (75.36 KB)
S17D-003 - GBL LUP - Application - May 26_17.PDF (617.42 KB)
S17D-003 - GBL LUP - Annex A5 - Clean-up Criteria for Petroleum Hydrocarbons - May 26_17.PDF (1.35 MB)
S17D-003 - GBL LUP - Annex A9 - Site Specific Target Levels for Terra Mine Wetland - May 26_17.PDF (3.67 MB)
S17D-003 - GBL LUP - Appendix A - Sahtu Land Use Plan Conformity Table - May 26_17.PDF (259.6 KB)
S17D-003 - GBL LUP - Appendix C - Proposed Transportation Routes - May 26_17.PDF (1.62 MB)
S17D-003 - GBL LUP - Appendix D - Summary Tables of Previous Remedial Activities - May 26_17.PDF (196.77 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S17D-003 - INAC-CARD - Review Comment Table Final - Jul 13_17.pdf (641.24 KB)
S17L8-002 - S17D-003 - Application Deemed Complete - Jun 1_17.pdf (372.9 KB)
S17D-003 - KBL Hazardous Waste Acceptance - Jun 23_17.pdf (211.75 KB)
S17D-003 - Letter of Support from Deline - Jun 15_17.pdf (51.64 KB)
S17LD-003 - Acceptance of Waste from Yellowknife - Jun 12_17.pdf (89.44 KB)
4. Permit Extension Request
Application and Related Docs
Document Received/Sent Uploaded
S17D-003 - Engagement for Extension - CIRNAC-CARD - Dec 7_22.pdf (3.03 MB)
S17D-003 - CIRNAC-CARD - Extension Request Submission Package - Nov 9_2022.pdf (299.27 KB)
S17D-003 - CIRNAC-CARD - Engagement - Land Use Permit Extension Consensus Deline - Nov8_22.pdf (107.74 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
S17D-003 - CIRNAC-CARD - Staff Report - Extension - Dec 7_22.pdf (3.48 MB)
S17D-003 - Review Comments for Extension - Dec 7_22.pdf (172.48 KB)
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Appendix E2 - Detail Design Drawings - May 26_17.PDF (8.44 MB)
S17D-003 - GBL LUP - Appendix E6 - Detail Design Drawings - May 26_17.PDF (3.51 MB)
S17D-003 - GBL LUP - Appendix E1 - Detail Design Drawings - May 26_17.PDF (9.46 MB)
S17D-003 - GBL LUP - Appendix E3 - Detail Design Drawings - May 26_17.PDF (9.75 MB)
S17D-003 - GBL LUP - Appendix E4 - Detail Design Drawings - May 26_17.PDF (9.5 MB)
S17D-003 - GBL LUP - Appendix E5 - Detail Design Drawings - May 26_17.PDF (9.23 MB)
Other
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Appendix K - List of Reports and Studies - May 26_17.PDF (90.88 KB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Annex A1-1 - Silver Bear Mines RAP with Project Updates - May 26_17.PDF (1015.91 KB)
S17D-003 - GBL LUP - Annex A1-2 - Silver Bear Mines RAP with Project Updates - May 26_17.PDF (9.92 MB)
S17D-003 - GBL LUP - Annex A1-3 - Silver Bear Mines RAP with Project Updates - May 26_17.PDF (16.96 MB)
S17D-003 - GBL LUP - Annex A1-4 - Silver Bear Mines RAP with Project Updates - May 26_17.PDF (3.8 MB)
S17D-003 - GBL LUP - Annex A2 - Contact Lake Mine RAP with Project Updates - May 26_17.PDF (8.05 MB)
S17D-003 - GBL LUP - Annex A3 - Bonanza Mine RAP with Project Updates - Mar 26_17.PDF (8.27 MB)
S17D-003 - GBL LUP - Annex A4-1 - Sawmill Bay RAP with Project Updates - May 26_17.PDF (26.74 MB)
S17D-003 - GBL LUP - Annex A4-3 - Sawmill Bay RAP with Project Updates - May 26_17.PDF (20.75 MB)
S17D-003 - GBL LUP - Annex A4-4 - Sawmill Bay RAP with Project Updates - May 26_17.PDF (22.38 MB)
S17D-003 - GBL LUP - Annex A4-2 - Sawmill Bay RAP with Project Updates - May 26_17.PDF (40.83 MB)
Engagement Plan
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Appendix F - Engagement Plan and Log - May 26_17.PDF (2.03 MB)
Other
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Appendix I - Wildlife Management Plan - May 26_17.PDF (303.11 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Appendix G - Spill Contingency Plan - May 26_17.PDF (4.55 MB)
Waste Management Plan
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Appendix H - Waste Management Plan - May 26_17.PDF (309.42 KB)
7. Monitoring Programs
Other Monitoring Program
Document Received/Sent Uploaded
S17D-003 - GBL LUP - Annex A8 - Proposed Long Term Status of Environmental and Construction Monitoring Plans - May 26_17.PDF (1.74 MB)
9. GIS Data
Shapefiles
Document Received/Sent Uploaded
S17D-003 - GBL LUP - GIS Data - May 26_17.zip (68.49 KB)