Enbridge Pipelines (NW) Inc. - S17L1-004
Status:
Expired
Authorization:
Licence
Activity:
Industrial
Start:
February 7, 2018
Expiry:
February 6, 2020
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280). All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however the Project will involve a watercourse crossing and there is the potential for a channel diversion.
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The associated application for a Type A Land Use Permit is S17P-005.
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The associated application for a Type A Land Use Permit is S17P-005.
Documents
- All Issuances (3)
- Annual Reports (7)
- Application and Related Docs (15)
- Assorted Management Plans (1)
- Consultations - Reviews - Work Plans (3)
- Engagement Plan (1)
- Final Closure and Reclamation Plan (5)
- Further Study Requested Sec. 22.2.b (1)
- Inspection Reports (2)
- Operations and Notifications (1)
- Preliminary Screening (1)
- Security and Water Use Fees (2)
- Sediment and Erosion Control (2)
- Spill - Contingency - Emergency Response (2)
- Waste Management Plan (1)
Displaying 1 - 47 of 47
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 - Enbridge Pipelines Inc. - Issuance Letter_Feb.7_18.pdf (335.37 KB) | ||
S17L1-004 - Enbridge Pipelines Inc. - Reasons for Decision_Feb.7_18.pdf (397.63 KB) | ||
S17L1-004 - Enbridge Pipelines Inc. - Water Licence_Feb.7_18.pdf (473.57 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 - Enbridge - Security Receipt Confirmation - Feb 26_18.pdf (694.16 KB) | ||
S17L1-004 - Enbridge - Receipt - Water Use Fees - Feb 13_18.pdf (45.46 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Staff Report 1 - Feb 7_18.pdf (815.92 KB) | ||
S17L1-004 S17P-005 - Enbridge - Line 21 Integrity Dig Saline River - Review Summary Table with Attachments - Jan 27_18.pdf (1.35 MB) | ||
S17L1-004 S17P-005 - Enbridge Responses to Review Comments and Draft Conditions with Attachments - Jan 25_18.pdf (405.45 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Board Decision WL and LUP Application - Further Study Required - Jan 29_18.pdf (96.56 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 - 2020 Annual Report - Mar 18_21.pdf (657.27 KB) | ||
S17L1-004 - Cover Letter - 2020 Annual Reports - Mar 31_21.pdf (21.66 KB) | ||
S17P-005 S17L1-004 - 2020 Annual Report - Mar 18_21.pdf (631.23 KB) | ||
S17L1-004 - Enbridge Pipelines Inc. - 2019 Annual Report - Mar_17_20.pdf (4.91 MB) | ||
S17L1-004 - Enbridge Pipelines Inc. - 2019 Annual Report Cover Letter - Mar_17_20.pdf (21.76 KB) | ||
S17P-005 - S17L1-004 - Review Comment Table with Letter from GNWT-ENR - Review of 2018 Annual Reports - May 7 _19.pdf (225.87 KB) | ||
S17L1-004 - Line 21 Annual Water Licence Report - Mar 29_19.pdf (10.13 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 - S17P-005 - Inspection Report - June-27-2022.pdf (1.13 MB) | ||
S17L1-004 - GNWT-ENR Inspection Report for Feb 26 2018 - Mar 2_18.pdf (702.75 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 - Enbridge - Notification of Diversion - Feb 16_18.pdf (62.32 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17P-005 S17L1-004 - Preliminary Screening - Feb 7_18.pdf (338.01 KB) |
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - revised WMP and SECP - Staff Conformity Confirmation - Feb 16_18.pdf (334.61 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Engagement plan - Dec 22_17.pdf (162.1 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 - Enbridge - Revised Erosion and Sediment Control Plan - Version 1.1 - Feb 15_18.pdf (3.13 MB) | ||
S17L1-004 S17P-005 - Enbridge - Sediment and Erosion Control Plan - Dec 22_17.pdf (3.73 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Spill Contingency Plan - Version 1.1 - Feb 16_18.pdf (12.6 MB) | ||
S17L1-004 S17P-005 - Staff Confirmation of Conformity - Spill Contingency Plan - Feb 19_18.pdf (283.9 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Revised Waste Management Plan - Version 1.1 - Feb 15_18.pdf (3.35 MB) |
8. Closure and Reclamation
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Board approval - CRP V1- Mar 26_18.pdf (312.49 KB) | ||
S17L1-004 S17P-005 - Staff Report 2 - CRP V1 - Mar 26_18.pdf (486.94 KB) | ||
S17L1-004 - Enbridge - CRP V1 - Review Summary Table and Attachments - Mar 26_18.pdf (378.97 KB) | ||
S17L1-004 S17P-005 - Enbridge - Closure and Reclamation Plan - Version 1.0 - Feb 28_18.pdf (1.89 MB) | ||
S17L1-004 S17P-005 - Extension of submission deadline for CRP - Feb 22_18.pdf (60.54 KB) |