Skip to main content

Fortune Minerals Limited - W2008L2-0004

This Licence entitles the Licensee to use water from Lou Lake and dispose of Waste for the purpose of constructing, operating, closing, and reclaiming the NICO Project, a Gold‐Cobalt‐Bismuth‐Copper mine located approximately 160 kilometres (km) northwest of Yellowknife, 50 km northeast of Whatì, and 10 km east of Hislop Lake in the Northwest Territories (NWT) on Mineral Leases NT-4681, 4682, 4678, 4679, 4237, 4677, 4684, 4683, 4238, 4680.The scope of this Licence includes the following:• an open pit and underground mine;• a mineral processing plant, which includes crushing, grinding, flotation, and service components;• a Co-Disposal Facility (CDF);• an effluent treatment facility;• the Constructed Wetland Treatment Systems (CWTS);• explosives storage facility;• borrow sources within the aforementioned Mineral Leases;• a camp and truck shop; and• site services infrastructure such as petroleum storage facilities, water lines, electrical distribution, site roads, a power plant, a Sewage treatment plant, an incinerator, and material sorting facilities.The scope of this Licence is as described in “Table 3: Final Scope of Development” in the Report of Environmental Assessment, and does not include the following:• the Construction, use, and Reclamation of the NICO Project Access Road outside of the aforementioned Mineral Leases;• the bridge over the Marian River;• the use of the Tłı̨chǫ road; and• the development of borrow sources for aggregate production along the NICO Project Access Road outside of the aforementioned Mineral Leases.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 13 of 13
5. Reports and Studies
Annual Reports
Document Received/Sent Uploaded
NICO Mine - 2022 Annual Report - Apr 19_23.pdf (10.12 MB)
NICO Mine - 2021 Annual Report - Apr 25_22.pdf (18.27 MB)
NICO Mine - 2020 Annual Report - Apr 22_21.pdf (6.72 MB)
NICO Mine - 2019 Annual Report - Apr 30_20.pdf (15.26 MB)
NICO Mine - 2018 Annual Report - Apr 30_19.pdf (8.31 MB)
NICO Mine - 2017 Annual Report - Apr 30_18.pdf (8.48 MB)
NICO Mine - 2016 Annual Report - Mar 26_17.pdf (67.04 KB)
NICO Mine - 2014 Annual Report - Outstanding Submissions - Apr 7_16.pdf (156.52 KB)
NICO Mine - 2015 Annual Report - Apr 7_16.pdf (59.32 KB)
NICO Mine - 2014 Annual Report - Apr 7_16.pdf (211.59 KB)
NICO Mine - 2014 Annual Report - Extended Delay Request - Nov 12_15.pdf (60.46 KB)
NICO Mine - 2014 Annual Report - Extension to Submission Deadline - Apr 24_15.pdf (152.01 KB)
NICO Mine - 2014 Annual Report - Deadline Extension Request - Apr 15_15.pdf (60.62 KB)