Skip to main content

Fortune Minerals Limited - W2008L2-0004

This Licence entitles the Licensee to use water from Lou Lake and dispose of Waste for the purpose of constructing, operating, closing, and reclaiming the NICO Project, a Gold‐Cobalt‐Bismuth‐Copper mine located approximately 160 kilometres (km) northwest of Yellowknife, 50 km northeast of Whatì, and 10 km east of Hislop Lake in the Northwest Territories (NWT) on Mineral Leases NT-4681, 4682, 4678, 4679, 4237, 4677, 4684, 4683, 4238, 4680.The scope of this Licence includes the following:• an open pit and underground mine;• a mineral processing plant, which includes crushing, grinding, flotation, and service components;• a Co-Disposal Facility (CDF);• an effluent treatment facility;• the Constructed Wetland Treatment Systems (CWTS);• explosives storage facility;• borrow sources within the aforementioned Mineral Leases;• a camp and truck shop; and• site services infrastructure such as petroleum storage facilities, water lines, electrical distribution, site roads, a power plant, a Sewage treatment plant, an incinerator, and material sorting facilities.The scope of this Licence is as described in “Table 3: Final Scope of Development” in the Report of Environmental Assessment, and does not include the following:• the Construction, use, and Reclamation of the NICO Project Access Road outside of the aforementioned Mineral Leases;• the bridge over the Marian River;• the use of the Tłı̨chǫ road; and• the development of borrow sources for aggregate production along the NICO Project Access Road outside of the aforementioned Mineral Leases.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 27 of 27
2. Initial/Renewal Application
Technical Session
Document Received/Sent Uploaded
NICO Mine - Technical Session - IR Response 1.pdf (188.79 KB)
NICO Mine - Technical Session - IR Response 2.pdf (212.37 KB)
NICO Mine - Technical Session - IR Response 3.pdf (129.74 KB)
NICO Mine - Technical Session - IR Response 4.pdf (587.62 KB)
NICO Mine - Technical Session - IR Response 5.pdf (88.6 KB)
NICO Mine - Technical Session - IR Response 6.pdf (75.55 KB)
NICO Mine - Technical Session - IR Response 7.pdf (47.73 KB)
NICO Mine - Technical Session - IR Response 8.pdf (3.45 MB)
NICO Mine - Technical Session - IR Response 9.pdf (202.81 KB)
NICO Mine - Technical Session - IR Response 11.pdf (142.17 KB)
NICO Mine - Technical Session - IR Response 11 - Final Argument Attachement SENES response.pdf (196.95 KB)
NICO Mine - Technical Session - IR Response 12.pdf (3.01 MB)
NICO Mine - Technical Session - IR Response 13.pdf (1.28 MB)
NICO Mine - Technical Session - IR Response 14.pdf (97.71 KB)
NICO Mine - Technical Session - IR Response 15.pdf (178.78 KB)
NICO Mine - Technical Session - IR Response 16.pdf (218.54 KB)
NICO Mine - Technical Session - IR Response 17.pdf (103.15 KB)
NICO Mine - Technical Session - IR Response 18.pdf (22.4 KB)
NICO Mine - Email to AANDC re IR2 WQOs - Jan 30_14.pdf (606.14 KB)
NICO Mine - Clarification re IRs 12 and 13 - Jan 17_14.pdf (295.26 KB)
NICO Mine - Attachment 1 for IR13 - Jan 17_14.xls (1.54 MB)
NICO Mine - Attachment 2 for IR13 - Jan 17_14.xls (1.09 MB)
NICO Mine - Request for 22yr Term of Licence - Jan 20_14.pdf (22.11 KB)
NICO Mine - Response to Technical Session Information Requests - Jan 7_14.pdf (10.02 MB)
NICO Mine - Project Update - Dec 9_13.pdf (797.55 KB)
NICO Mine - WLWB Information Requests from Technical Session - Dec 12_13.pdf (116.29 KB)
NICO Mine - Technical Session - IR Response 10 - Plankton Study - Dec 12_13.pdf (2.4 MB)