Skip to main content

Dominion Diamond Mines ULC - W2016F0007

Construction of the Jay Road, including the cut through the esker; construction of the Jay Road North and the Jay Pipeline Road; Construction of a Pipeline bench; construction of caribou crossings; construction of laydown areas; construction and use of an esker cut stockpile location; use of explosives; establishment of infrastructure to support construction; and installation of a communications tower.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
Ekati - Jay Early Works - DFO Response to Ac35 Water Crossing As-Built - Dec 20_18.pdf (114.13 KB)