Skip to main content

GNWT-INF - W2016S0009

This Permit entitles the Government of the Northwest Territories Department of Infrastructure to conduct the following land-use operation:a) Geotechnical drilling investigations within the proposed area outlined in the complete application;b) Use of a temporary campsite;c) Fuel storage;d) Use of equipment, vehicles, and machines to support operations; ande) Construction, use, and maintenance of a winter road.
The Project is for Geotechnical Drilling and is located on the Tlicho All-Season Road Alignment from Highway 3 to the Tlicho Community of Whati, NT.
Uploaded On or After
Uploaded On or Before
Displaying 1 - 11 of 11
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
W2016S0009 - GNWT-DOT - Geotechnical Investigations - Application Complete Letter - Dec 2_16.pdf (393.81 KB)
W2016S0009 - GNWT-DOT - LUP Application - Design Phase for Geotechnical Investigations - Nov 23_16.pdf (9.49 MB)
W2016S0009 - GNWT-DOT - TG Letter - Re Access to Tlicho Lands for Design Phase Geotechnical Investigations - Nov 21_16.pdf (295.95 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
W2016S0009 - GNWT-DOT - Geotech Investigations - Review Summary and Attachments - Jan 4_17.pdf (1.42 MB)
W2016S0009 - GNWT-DOT - Geotech Investigations -DAAIR Letter to NSMA re Updated Timeline Release of SOC Results - Dec 16_16.pdf (1.99 MB)
W2016S0009 - GNWT-DOT - GNWT Response letter to WLWB Re NSMA Letter Regarding Consultation - Dec 16_16.pdf (107.77 KB)
W2016S0009 - GNWT-DOT - WLWB Response to NSMAs Letter Re Consultation - Dec 15_16.pdf (849.63 KB)
W2016S0009 - GNWT-DOT - NSMA Letter Re Consultation Regarding Design Phase Geotechnical Investigations - Dec 13_16.pdf (76.02 KB)
W2016S0009 - GNWT-DOT - LUP Aplication - Proponent Response - Extension Request - Dec 8_16.pdf (260.62 KB)
W2016S0009 - GNWT-DOT - Geotechnical Investigations - DRAFT LUP - Dec 2_16.pdf (694.03 KB)
Preliminary Screening
Document Received/Sent Uploaded
W2016S0009 - GNWT-DOT - Preliminary Screening - Jan 13_17.pdf (1.12 MB)