Skip to main content

Diavik Diamond Mines (2012) Inc. - W2017C0002

(This Permit was previously permitted under Permit W2010C0003).
This Permit entitles Diavik Diamond Mines (2012) Inc. to conduct the following land-use operation:a) winter road construction;b) fuel positioning and storage;c) ground geophysical, geological, and geochemical surveys;d) diamond drilling programs and reverse circulation drilling programs; andOperations are to be located in the Lac de Gras, Thonokied, and Glowworm Lake areas: Min: 64° 20’ N, 108° 45’ W; Max: 64° 55’ N, 111° 30’W
This Project is for Mineral Exploration and is located in the Lac de Gras, Thonokied, and Glowwarm Lake areas, NT.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 25 of 25
5. Reports and Studies
Progress Reports
Document Received/Sent Uploaded
Diavik - Drilling Progress Report - Jun 30_23.pdf (832.19 KB)
Diavik - Drilling Progress Report - Jun 1_23.pdf (1.04 MB)
Diavik - Drilling Progress Report - May 2_23.pdf (590.54 KB)
Diavik - Drilling Progress Report - Mar 30_23.pdf (479.91 KB)
Diavik - Drilling Progress Report - Sep 8_22.pdf (455.47 KB)
Diavik - Drilling Progress Report - Aug 16_22.pdf (344.44 KB)
Diavik - Drilling Progress Report - Jul 3_22.pdf (430.03 KB)
Diavik - Drilling Progress Report - Jun 4_22.pdf (449.22 KB)
Diavik - Drilling Progress Report - May 3_22.pdf (252.84 KB)
Diavik - Drilling Progress Report - Apr 1_22.pdf (311.07 KB)
W2017C0002 - Diavik - Drilling Progress Report - Aug 1_21.pdf (344.86 KB)
W2017C0002 - Diavik - Drilling Progress Report - Aug 31_21.pdf (492.44 KB)
W2017C0002 - Diavik - Drilling Progress Report - May 31_21.pdf (324.43 KB)
W2017C0002 - Diavik - Drilling Progress Report - Apr 4_21.pdf (570.47 KB)
W2017C0002 - Diavik - Drilling Progress Report - May 5_21.pdf (502.39 KB)
W2017C0007 - Diavik - Notice of Pending Completion - Sep 23_20.pdf (2.44 MB)
W2017C0002 - Diavik - Drilling Progress Report - Sep 27_20.pdf (395.79 KB)
W2017C0002 - Diavik - Drilling Progress Report - Sep 1_20.pdf (282.82 KB)
W2017C0002 - Diavik - Drilling Progress Report - Aug 4_20.pdf (656.5 KB)
W2017C0002 - Diavik - Drilling Progress Report - Apr 4_20.pdf (3.13 MB)
W2017C0002 - Diavik - Drilling Progress Report - May 29_20.pdf (552.86 KB)
W2017C0002 - Diavik - Drilling Progress Report - Apr 30_20.pdf (209 KB)
W2017C0002 - Diavik - Drilling Progress Report - Mar 31_20.pdf (564.73 KB)
W2017C0002 - Diavik - Drilling Progress Report - Sep 27_19.pdf (136.52 KB)
W2017C0002 - Diavik - Drilling Progress Report - DDMI Letter to Inspector - May 30_17.pdf (99.16 KB)