Skip to main content

Nighthawk Gold Corp. - W2018C0007

(This Permit was previously permitted under Permit W2012C0003).

This Permit entitles the Permittee to conduct the following land-use operation in the Damoti Lake and Colomac Mine areas:a) Mineral Exploration including diamond drilling;b) Construction, maintenance, and use of winter road and access roads;c) Use and storage of fuel;d) Use and storage of explosives;e) Operation of a camp(s); andf) Use of vehicles and equipment.
The Project is for Mineral Exploration and is located at Damoti Lake and Colomac Mine Site areas, NT.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 7 of 7
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
W2018C0007 - Nighthawk - 2022 Drill Program - Apr 19_22.pdf (1.57 MB)
W2018C0007 - Nighthawk - 2022 Notification of Camp Re-Opening - Feb 14_22.pdf (2.55 MB)
W2018C0007 - Nighthawk - 2021 Drill Target Locations - Feb 26_21.pdf (9.82 MB)
W2018C0007 - Nighthawk - 2021 Notification of Camp Re-Opening - Feb 19_21.pdf (10.85 MB)
W2018C0007 - Nighthawk - 2020 Proposed Drill Operations - Sep 14_20.pdf (2.66 MB)
W2018C0007 - Nighthawk - 2020 Notification of Camp Re-Opening and Proposed Drill Locations - Jul 6_20.pdf (3.34 MB)
W2018C0007 - Nighthawk - 2021 Notification of Camp Re-Opening - Jan 21_21.pdf (538.27 KB)