Skip to main content

Nighthawk Gold Corp. - W2018X0006

(This Permit was previously permitted under Permit W2012X0003).

This Permit entitles the Permittee to conduct the following land-use operation:a) conduct remediation work within the Damoti Lake, Diversified, Spider Lake, and Chalco Lake sites.
The Project is for Remediation and is located at Damoti Lake, Diversified Lake, Chalco Lake, and Spider Lake Sites.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 6 of 6
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
W2018X0006 - Nighthawk - 2024 Notification of Camp Re-opening - Mar 21_24.pdf (495.5 KB)
W2018X0006 - Nighthawk - 2023 Notification of Drill Program - Mar 6_23.pdf (1.75 MB)
W2018X0006 - Nighthawk - 2023 Notification of Camp Re-opening - Jan 29_23.pdf (2.07 MB)
Other
Document Received/Sent Uploaded
W2018X0006 - Nighthawk - 2020 Fuel Report - Jan 10_21.pdf (2.62 MB)
W2018X0006 - Nighthawk - 2020 Fuel Report for Colomac - Apr 25_20.pdf (1.5 MB)
W2018X0006 - Nighthawk - 2019 Fuel Report - Nov 6_19.pdf (1.8 MB)