This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:

a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; and
h) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.

Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 26 of 26
2. Initial/Renewal Application
Public Hearing
Document Received/Sent Uploaded
Rayrock - Type A LUP and WL Applications - Newspaper Notice of Public Hearing - Mar 22_21.png (48.29 KB)
Rayrock - Public Hearing - Closing Arguments - CIRNAC - Jul 15_21.pdf (214.18 KB)
Rayrock - Public Hearing - Closing Arguments - GNWT-ENR - Jul 2_21.pdf (151.67 KB)
Rayrock - Public Hearing - Closing Arguments - TG - Jul 2_21.pdf (255.86 KB)
Rayrock - Public Hearing - Undertaking Response from CIRNAC - Appendix A - May 14_21.pdf (4.34 MB)
Rayrock - Public Hearing - Undertaking Response from CIRNAC - May 14_21.pdf (3.95 MB)
Rayrock - Public Hearing - Undertaking Response from GNWT - May 14_21.pdf (338.35 KB)
Rayrock - Public Hearing - Undertaking Response from TG - Part I - May 14_21.pdf (10.09 MB)
Rayrock - Public Hearing - Undertaking Response from TG - Part II - May 14_21.pdf (18.4 MB)
Rayrock - Public Hearing Transcript from Day 1 of 3 - Apr 28_21.pdf (912.34 KB)
Rayrock - Public Hearing Transcript from Day 2 of 3 - Apr 29_21.pdf (1.02 MB)
Rayrock - Public Hearing Transcript from Day 3 of 3 - Apr 30_21.pdf (650.68 KB)
Rayrock - Type A WL and LUP Applications - Public Hearing - Undertakings - Apr 30_21.pdf (209.36 KB)
Rayrock - WLWB Request for Participation in Rayrock Public Hearing - Health Canada Response - Apr 27_21.pdf (332.93 KB)
Rayrock - Type A LUP and WL Applications - Public Hearing - CIRNAC Presentation - Apr 21_21.pdf (13.12 MB)
Rayrock - Type A LUP and Type A WL Applications - Public Hearing - Agenda - Apr 21_21.pdf (171.84 KB)
Rayrock - Type A LUP and WL Applications - Public Hearing - TG Presentation - Apr 21_21.pdf (9.75 MB)
Rayrock - Type A LUP and WL Applications - CIRNAC Intervention Response - Apr 19_21.pdf (2.31 MB)
Rayrock - Type A LUP and WL Applications - Public Hearing - GNWT Presentation - Apr 20_21.pdf (1.08 MB)
Rayrock - Request for ECCC Participation in Hearing - ECCC Response - Apr 16_21.pdf (291.16 KB)
Rayrock - Request for HC and ECCC Participation in Rayrock Public Hearing - Letter from WLWB - Apr 13 _21.pdf (179.04 KB)
Rayrock - Type A LUP and WL Applications - DFO Non-Intervention - Apr 7_21.pdf (339.06 KB)
Rayrock - Type A LUP and WL Applications - GNWT-ENR Intervention - Apr 8_21.pdf (168.66 KB)
Rayrock - Type A LUP and WL Applications - TG Intervention - Apr 8_21.pdf (6.83 MB)
Rayrock - Request for CNSC Participation in Rayrock Public Hearing - Letter from WLWB - Mar 2_21.pdf (176.21 KB)
Rayrock - Type A LUP and WL Applications - Pre-Hearing Conference Agenda - Feb 10 _21.pdf (109.07 KB)