Skip to main content

Arctic Canadian Diamond Company Ltd. - W2021D0005

This Permit entitles the Permittee to conduct the following land-use operation:a) construction of the Point Lake access road;b) operation and maintenance of the Lac du Sauvage road (formerly Jay road);c) construction of caribou crossings on Lac du Sauvage road;d) establishment of dewatering infrastructure;e) construction of a utility pad and field office;f) construction of an erosion-resistant boulder field in Lac du Sauvage;g) dewatering and fish-out of Point Lake;h) extraction of waste rock and kimberlite ore from the Point Lake Pit;i) construction of waste rock storage areas and overburden stockpile;j) construction and operation of supporting and water management infrastructure;k) storage of fuels;l) use of machinery and equipment to support operations; andm) closure and reclamation of project components.

Mining Activities for the Point Lake Project.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
6. Management Plans
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
Ekati - Point Lake - Spill Contingency Plan Version 15 - May 31_21.pdf (3.2 MB)