Northwest Territories Power Corporation - W2021Q0011
Status:
Issued
Authorization:
Land Use Permit
Activity:
Quarrying
Start:
January 4, 2022
Expiry:
January 3, 2027
Staff:
Kassandra DeFrancis
This Permit entitles the Permittee to conduct the following land-use operation:a) Construction, maintenance, and use of winter roads;b) Quarrying, crushing, and stockpiling of granular material;c) Establishment and use of petroleum fuel storage facilities;d) Establishment and use of temporary satellite camps;e) Use of vehicles and equipment; andf) Use of explosives.
NTPC for Snare Hydroelectric Facility - Site Wide Type A LUPA
Displaying 1 - 7 of 7
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
NTPC - Land Use Inspection Report - March 5 2025 - Mar 7_25.pdf (919.15 KB) | ||
NTPC - Land Use Inspection Report - February 21 2024 - Feb 23_24.pdf (2.09 MB) | ||
NTPC - Land Use Inspection Report - March 16 2023 - Mar 17_23.pdf (795.37 KB) | ||
NTPC - Land Use Inspection Report - March 1 2023 - Mar 9_23.pdf (628.97 KB) | ||
NTPC - Land Use Inspection Report - January 27, 2023 - Jan 30_23.pdf (798.33 KB) | ||
NTPC - Land Use Inspection Report - February 24 2022 - Feb 28_22.pdf (1.77 MB) | ||
NTPC - Land Use Inspection Report - March 22 2022 - Mar 23_22.pdf (407.13 KB) |