Tlicho Government - W2021X0001

This Permit entitles the Permittee to conduct the following land-use operation:a) Installation of a fibre optic cable;b) the use of motorized earth-drilling machinery;c) Use of fuel;d) the use of self-propelled earth-moving equipment, and vehicles and machines over 10 tons;e) Clearing of vegetation as required in the Right of Way;f) Ongoing operation and maintenance.
The Project is to build 115 kilometres of transport fibre to connect Whatì to NorthwesTel's fibre line to replace the existing microwave radios. The TASR provides a clear Right-of-Way and sufficient space for the installation of the fibre along the edge of the newly build road. 


Documents

Displaying 1 - 15 of 15
Uploaded On or After
Uploaded On or Before
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
Tlicho Fibre Optic Project - Land Use Permit and RFD - Apr 26_21.pdf (909.64 KB) April 26, 2021 May 5, 2021
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
Tlicho Fibre Optic Project - Land Use Permit Application - Review Summary and Attachments - Apr 1_21.pdf (3.17 MB) April 1, 2021 April 1, 2021
Tlicho Fibre Optic Project - Draft Land Use Permit - Mar 4_21.pdf (351.79 KB) March 4, 2021 March 4, 2021
Preliminary Screening
Document Received/Sent Uploaded
Tlicho Fibre Optic Project - Preliminary Screening Determination and RFD - Apr 15_21.pdf (510.54 KB) April 15, 2021 April 15, 2021
5. Reports and Studies
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
Tlicho Fibre Optic Project - Land Use Permit Application - Wildlife Management and Monitoring Plan - Version 1.0 - Mar 2_21.pdf (3.77 MB) March 2, 2021 March 3, 2021
9. GIS Data
GIS Data
Document Received/Sent Uploaded
Tlicho Fibre Optic Project - Land Use Permit Application - GIS Data - Mar 7_21.zip (89.13 KB) March 7, 2021 March 8, 2021