This Permit entitles the Permittee to conduct the following land-use operation:The construction, operation, and maintenance of a haul road to the Pigeon and Sable Pit developments, including the construction of water crossings, caribou crossings, and the development of a spur road to access and set up facilities at Falcon Lake for the purpose of road watering.

The Project is for Mining and Associated Activities at the Ekati Mine at 110°36’39”W – 110°36’48”W, 64°44’39”N – 64°44’39”N.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
Ekati - Pigeon and Sable Haul Road - Draft Land Use Permit - May 29_23.pdf (267.39 KB)