Arctic Canadian Diamond Company Ltd. - W2023F0004

This Permit entitles the Permittee to conduct the following land-use operation:The construction, operation, and maintenance of a haul road to the Pigeon and Sable Pit developments, including the construction of water crossings, caribou crossings, and the development of a spur road to access and set up facilities at Falcon Lake for the purpose of road watering.

The Project is for Mining and Associated Activities at the Ekati Mine at 110°36’39”W – 110°36’48”W, 64°44’39”N – 64°44’39”N.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
Ekati - Sable Haul Road - Detailed Spill Report - 2024048 - Mar 24_24.pdf (369.85 KB)
Ekati - Sable Haul Road - Detailed Spill Report - 2023453 - Nov 20_23.pdf (156.58 KB)
Ekati - Sable Haul Road - Detailed Spill Report - 2023441 442 and 443 - Nov 22_23.pdf (721.56 KB)