GNWT-INF - W2025X0003

​to replace the Dehk’è Frank Channel Bridge (Project) on the Highway-3 corridor. Project Activities include: 

  • construction and operation of a temporary camp and a laydown area;
  • re-alignment of the Right-of-Way
  • replacement of the existing bridge
  • installation of temporary drainage system and construction of permanent drainage system with new culverts
  • construction of temporary ice bridges
  • rock blasting to construct temporary accesses to build new bridge and deconstruct the other.