This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:

a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; andh) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).

Documents

Displaying 1 - 14 of 14
Uploaded On or After
Uploaded On or Before
2. Initial/Renewal Application
Technical Session
Document Received/Sent Uploaded
Rayrock - Technical Session - IR 17 Review Comment Table - Mar 30_21.pdf (336.68 KB) March 30, 2021 March 30, 2021
Rayrock - Technical Session - IRs 18-21 Review Comment Table - Mar 30_21.pdf (1.84 MB) March 30, 2021 March 30, 2021
Rayrock - Technical Session - CIRNAC IR Response - Feb 24_21.pdf (7.28 MB) February 24, 2021 February 24, 2021
Rayrock - Technical Session - CIRNAC IR Response - Feb 16_21.pdf (108.53 KB) February 16, 2021 February 17, 2021
Rayrock - Technical Session - Information Requests - Feb 16_21.pdf (165.32 KB) February 16, 2021 February 16, 2021
Rayrock - Technical Session - CIRNAC IR Response - Feb 10_21.pdf (1.28 MB) February 10, 2021 February 11, 2021
Rayrock - Technical Session - ECCC IR Response - Feb 10_21.pdf (236.31 KB) February 10, 2021 February 11, 2021
Rayrock - Technical Session - Information Request - Feb 9_21.pdf (132.04 KB) February 9, 2021 February 9, 2021
Rayrock - Technical Session - Information Requests - Jan 29_21.pdf (171.99 KB) January 29, 2021 January 29, 2021
Rayrock - Technical Session - Technical Expert CVs - Jan 25_21.pdf (618.05 KB) January 25, 2021 January 25, 2021
Rayrock - Type A WL and LUP Applications - Technical Session Agenda - Jan 25_21.pdf (189.79 KB) January 25, 2021 January 25, 2021
Rayrock - Technical Session - Compiled Presentations - Jan 25_21.pdf (8.32 MB) January 25, 2021 January 25, 2021
Rayrock - Technical Session - CRP-RAP Presentation - Jan 25_21.pdf (29.32 MB) January 25, 2021 January 25, 2021
Rayrock - Type A WL and LUP Applications - Draft Technical Session Agenda - Jan 15_21.pdf (195.9 KB) January 15, 2021 January 15, 2021