This Licence entitles the Licensee to use Water and deposit Waste for remediation activities at the Rayrock Remediation Project in the area as described in the Type A Water Licence Application submitted September 21, 2020. The scope of this Licence includes the following:

a) Blasting, quarrying, and drilling activities for remediation activities; removal andshipping or burial of hazardous and non-hazardous waste in the ConfinedDisposal Facility; maintenance of Tailings Containment Areas andDecommissioned Waste Dump; Sherman Lake dock expansion; repairs to capsfor Tailings Containment Areas and decommissioned Waste Dump, incinerationor stockpiling for off-site disposal of waste from Camp operations; closure ofRayrock vent raises and Sun Rose mine shaft; capping waste rock andexploration workings at Sun Rose site; backfilling of trenches and blasted areasat Horn Plateau – REX Showing site; capping exploration workings at HornPlateau – REX Showing site; burial or trucking out of soil with hazardouschemicals from exploration sites; removal of hazardous waste at barge landingand power line sites; removal of non-hazardous waste from exploration sites;storage and use of explosives; excavation and on-site disposal of spilled tailings;brush and vegetation clearing for access roads; access road development andmaintenance; camp establishment at Rayrock and Sun Rose sites; use andregrading of quarry areas; fuel storage for operations; use of light and heavyequipment on site; treatment and encapsulation of Mill Lake sediments;encapsulation of soil, tailings, and waste rock in Confined Disposal Facility;burial of radiological-impacted debris in Confined Disposal Facility; off-sitedisposal of debris and materials within safe shipping limits for Uranium;removal and disposal of concrete foundations; sewage disposal; andremediation activities as approved in the Remedial Action Plan;b) Withdrawal of Water for use in camp operations, dust control, washing, winterroad construction, and remediation activities as approved in the RemedialAction Plan;c) Dewatering of Mill Lake to Waste Water Treatment Facility before deposit inSherman Lake,d) Depositing of Waste to Confined Disposal Facility and the Camp sump;e) Construction, operation, and maintenance of ice bridges to cross the EmileRiver or the Marian River;f) Construction, operation and maintenance of culverts to allow winter roadpassage;g) Construction, operation and maintenance of the Confined Disposal Facility andSun Main Waste Rock Cover; and
h) Closure and Reclamation activities for the remediation and monitoring of theRayrock project sites.

Rayrock Mine Remedial Action Plan (Rayrock Remediation Project).


Uploaded On or After
Uploaded On or Before
Displaying 101 - 200 of 285
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2019 Assessment Report Part 2 of 7 - Feb 28_24.pdf (21.98 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2019 Assessment Report Part 3 of 7 - Feb 28_24.pdf (18.19 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2019 Assessment Report Part 4 of 7 - Feb 28_24.pdf (14.6 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2019 Assessment Report Part 5 of 7 - Feb 28_24.pdf (17.91 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2019 Assessment Report Part 6 of 7 - Feb 28_24.pdf (5.02 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2019 Assessment Report Part 7 of 7 - Feb 28_24.pdf (22.18 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2021 Assessment Report Part 1 of 3 - Feb 28_24.pdf (11.06 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2021 Assessment Report Part 2 of 3 - Feb 28_24.pdf (22.05 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2021 Assessment Report Part 3 of 3 - Feb 28_24.pdf (12.31 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2023 Bedrock Report Part 1 of 6 - Feb 28_24.pdf (10.39 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2023 Bedrock Report Part 2 of 6 - Feb 28_24.pdf (11.09 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2023 Bedrock Report Part 3 of 6 - Feb 28_24.pdf (15.6 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2023 Bedrock Report Part 4 of 6 - Feb 28_24.pdf (16.22 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2023 Bedrock Report Part 5 of 6 - Feb 28_24.pdf (21.5 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - 2023 Bedrock Report Part 6 of 6 - Feb 28_24.pdf (8.45 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - QAQC Plan - Feb 28_24.pdf (19.63 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - Misc. supporting materials - Feb 28_24.pdf (12.88 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix E - Basis of Payment - Feb 28_24.pdf (118.84 KB)
CDF Design Plan - Version 1.2 - Appendix F - Membrane Life Assessment Part 1 of 3 - Feb 28_24.pdf (16.51 MB)
CDF Design Plan - Version 1.2 - Appendix F - Membrane Life Assessment Part 2 of 3 - Feb 28_24.pdf (12.38 MB)
Rayrock - CDF Design Plan - Vesion 1.2 - Appendices G, H, and I - Feb 28_24.pdf (12.87 MB)
Rayrock - CDF Design Plan - Version 1.2 - Appendix D - Mill Lake Sediment Remediation FS - Feb 28_24.pdf (16.81 MB)
Rayrock - CDF Design Plan - Version 1.2 - Conformity confirmation.pdf (246.14 KB)
Rayrock - CDF Design Plan - Version 1.2 - Slope Stability Analysis - Feb 28_24.pdf (1.11 MB)
Rayrock - CDF Construction Plan - Version 1.1 – Conformity Confirmation – Feb 19_24.pdf (147.03 KB)
Rayrock - CDF Construction Plan - Version 1.1 – Part 1 of 2 - Feb 9_24.pdf (16.69 MB)
Rayrock - CDF Construction Plan - Version 1.1 – Part 2 of 2 - Feb 9_24.pdf (13.25 MB)
Rayrock - Sun Main Waste Rock Cover Design Plan - Jan 9_24.pdf (21.21 MB)
Rayrock - CDF Design V1.1 and Construction Plan V1.0 - Reasons for Decision - Dec 14_23.pdf (542.91 KB)
Rayrock – CDF Construction Plan V1 and CDF Design Plan 1.1 - Follow-up Correspondence – Nov 3_23.pdf (4.57 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix E - Basis of Payment - Aug 3_23.pdf (118.84 KB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix F - Membrane Life Assessment Part 1 of 3 - Aug 3_23.pdf (16.51 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix F - Membrane Life Assessment Part 2 of 3 - Aug 3_23.pdf (12.38 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix F - Membrane Life Assessment Part 3 of 3 - Aug 3_23.pdf (12.36 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2019 Assessment Report Part 1 of 7 - Aug 3_23.pdf (14.47 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2019 Assessment Report Part 2 of 7 - Aug 3_23.pdf (21.98 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2019 Assessment Report Part 3 of 7 - Aug 3_23.pdf (18.19 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2019 Assessment Report Part 4 of 7 - Aug 3_23.pdf (14.6 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2019 Assessment Report Part 5 of 7 - Aug 3_23.pdf (17.91 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2019 Assessment Report Part 6 of 7 - Aug 3_23.pdf (5.02 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2019 Assessment Report Part 7 of 7 - Aug 3_23.pdf (22.18 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2021 Assessment Report Part 1 of 3 - Aug 3_23.pdf (11.06 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2021 Assessment Report Part 2 of 3 - Aug 3_23.pdf (22.05 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2021 Assessment Report Part 3 of 3 - Aug 3_23.pdf (12.31 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2023 Bedrock Report Part 1 of 6 - Aug 3_23.pdf (10.39 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2023 Bedrock Report Part 2 of 6 - Aug 3_23.pdf (11.09 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2023 Bedrock Report Part 3 of 6 - Aug 3_23.pdf (15.6 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2023 Bedrock Report Part 4 of 6 - Aug 3_23.pdf (16.22 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2023 Bedrock Report Part 5 of 6 - Aug 3_23.pdf (21.5 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - 2023 Bedrock Report Part 6 of 6 - Aug 3_23.pdf (8.45 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - Misc. supporting materials - Aug 3_23.pdf (12.88 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - Mill Lake Sediment Remediation Feasability Study - Aug 3_23.pdf (16.81 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix D - QAQC Plan - Aug 3_23.pdf (19.63 MB)
Rayrock - CDF Design Plan - Vesion 1.1 - Appendices G, H, and I - Aug 3_23.pdf (12.87 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix C - Specifications - Aug 3_23.pdf (2.34 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix B - Drawings Part 7 of 7 - Aug 3_23.pdf (10.54 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix B - Drawings Part 6 of 7 - Aug 3_23.pdf (22.13 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix B - Drawings Part 5 of 7 - Aug 3_23.pdf (19.96 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix B - Drawings Part 4 of 7 - Aug 3_23.pdf (18.59 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix B - Drawings Part 3 of 7 - Aug 3_23.pdf (17.71 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix B - Drawings Part 2 of 7 - Aug 3_23.pdf (23.83 MB)
Rayrock - CDF Design Plan - Version 1.1 - Appendix B - Drawings Part 1 of 7 - Aug 3_23.pdf (16.25 MB)
Rayrock - CDF Design Plan - Version 1.1 - Cover Letter, Report, Appendix A - Aug 3_23.pdf (2.83 MB)
Rayrock - Confined Disposal Facility Construction Plan - Version 1.0 - Jul 6_23.pdf (15.35 MB)
Rayrock - Mill Lake WTF Design and Construction Plan - Version 1.1 - Decision Letter - Jul 6_23.pdf (178.12 KB)
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - Version 1.1 - May 31_23.pdf (8.96 MB)
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - Version 1.1 - Appendices A-G - May 31_23.pdf (17.88 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Reasons for Decision - May 01_23.pdf (418.81 KB)
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - V 1.0 - Reasons for Decision - May 01_23.pdf (447.02 KB)
Rayrock - Mill Lake Water Treatment Facility Design and Construction Plan - Version 1.0 - Jan 6_23.pdf (17.37 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Dec 22_22.pdf (3.85 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications I - Dec 22_22.pdf (24.19 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications II - Dec 22_22.pdf (27.43 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications III - Dec 22_22.pdf (22.82 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix A - Drawings and Specifications IV - Dec 22_22.pdf (25.61 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report I - Dec 22_22.pdf (14.74 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report II - Dec 22_22.pdf (28.5 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report III - Dec 22_22.pdf (25.3 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report IV - Dec 22_22.pdf (23.32 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report V - Dec 22_22.pdf (814.6 KB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report VI - Dec 22_22.pdf (21.32 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report VII - Dec 22_22.pdf (21.32 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part I - Bedrock Report VIII - Dec 22_22.pdf (3.97 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix B - Part II - Dec 22_22.pdf (25.62 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix C - Basis of Payment - Dec 22_22.pdf (264.1 KB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix D - Membrane Life Assessment - Dec 22_22.pdf (28.91 MB)
Rayrock - Confined Disposal Facility Design Plan - Version 1.0 - Appendix E - Forms - Dec 22_22.pdf (368.4 KB)
Rayrock - Confined Disposal Facility and Sun Main Waste Rock Cover Design Plans - Conformity Correspondence - Dec 22_22.pdf (318.32 KB)
Operations and Notifications
Document Received/Sent Uploaded
Rayrock - Certificate of Analysis - Guideline Evaluation - Nov 17_23.pdf (489.1 KB)
Rayrock - Email String - Certificate of Analysis - Guideline Evaluation - Nov 17_23.pdf (211.5 KB)
Rayrock - CWWTP Results Analysis and Request for Discharge From SNP 1663-11 - Nov 06_23.pdf (114.99 KB)
Rayrock - Notification - Intention to Commence Winter Road Construction - Feb 1_23.pdf (96.16 KB)
Other
Document Received/Sent Uploaded
Rayrock - Confined Disposal Facility - Thermal Modelling - Jul 5_21.pdf (4.59 MB)
Rayrock - Confined Disposal Facility - Hydrological Modelling - Sept 9_21.pdf (3.5 MB)
SNP Reports
Document Received/Sent Uploaded
Rayrock - June 2023 - Updated Surveillance Network Program Report - March 25_24.pdf (3.32 MB)
Rayrock - July 2023 - Updated Surveillance Network Program Report - March 25_24.pdf (3.56 MB)
Rayrock - September 2023 - Updated Surveillance Network Program Report - March 25_24.pdf (2.73 MB)
Rayrock - (July-Sept) 2023 - Updated SNP Report Electronic Data - March 25_24.zip (78.18 KB)
Rayrock -October 2023 - Surveillance Network Program Report - Jan 26_24.pdf (1.61 MB)
Rayrock - (July-Sept) 2023 - SNP Report Electronic Data File - Jan 26_24.zip (68.15 KB)