GNWT-INF |
MV2020L8-0004 |
GNWT-INF - Erosion Control Work - Project Completed - Email Correspondence - Aug27_21.pdf (169.71 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
GMRP - LUI Notification - AR-1 Freeze Pad Construction - Aug20_21.pdf (677.35 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
GMRP - LUI Notification - AR-1 Freeze Pad Construction - Aug20_21.pdf (677.35 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - 2021 Annual Geotechnical Inspection for Giant Mine Dams - Aug11_21.pdf (17.44 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Waster Transfer Facility - Aug11_21.pdf (439.95 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Waster Transfer Facility - Aug11_21.pdf (439.95 KB) |
|
|
City of Yellowknife |
MV2019X0013 |
City of YK - update to Background Monitoring Well Drilling timing - Aug11_21.pdf (214 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification -Request for Approval Response- Aggregate Supply for Early Works Projects - Aug11_21.pdf (224.93 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification -Request for Approval Response- Aggregate Supply for Early Works Projects - Aug11_21.pdf (224.93 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - 2021 Annual Geotechnical Inspection for Giant Mine Dams - Aug11_21.pdf (17.44 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Request for Approval - Aggregate Supply for Early Works Projects - Aug10_21.pdf (723.42 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Request for Approval - Aggregate Supply for Early Works Projects - Aug10_21.pdf (723.42 KB) |
|
|
GNWT-INF |
W2020L8-0001 |
W2020L8-0001 - TASR - Notification - Initiation of Water Withdrawal at La Martre River - Aug 8_21.pdf (194 KB) |
|
|
Town of Hay River |
MV2021X0010 |
Town of Hay River - Correspondence re additional wells to be drilled at SWDF - Aug7_21.pdf (233.65 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Power Service Interruption - Aug6_21.pdf (134.48 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Power Service Interruption - Aug6_21.pdf (134.48 KB) |
|
|
Northwest Territories Power Corporation |
MV2020X0004 |
NTPC - Taltson Upgrades - Notification of Standard Operating Procedure - Aug6_21.pdf (797.69 KB) |
|
|
Northwest Territories Power Corporation |
MV2021L8-0007 |
MV2021L8-0007 - NTPC - Bluefish Habitat Enhancement Project - Update from NTPC - July29_21.pdf (283 KB) |
|
|
GNWT-ECC |
MV2017L8-0004 |
GNWT-ENR - Checkpoint - Discharge Request Approval - Jul27_21.pdf (221.54 KB) |
|
|
City of Yellowknife |
MV2019X0013 |
City of YK - update to Background Monitoring Well Drilling timing - Jul27_21.pdf (2.14 MB) |
|
|
City of Yellowknife |
MV2019X0013 |
City of Yellowknife - Notification of drilling commencement and Inspector correspondence - Jul26_21.pdf (16.73 MB) |
|
|
GNWT-ECC |
MV2017L8-0004 |
GNWT-ENR - Checkpoint - Request to Inspector for Decant - Jul23_22.pdf (2.07 MB) |
|
|
City of Yellowknife |
MV2019X0013 |
City of YK - notice of drilling commencement - Jul22_21.pdf (195.91 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Request for Authorization Waste Temporary Storage - Jul21_21.msg (145 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Request for Authorization Waste Temporary Storage - Jul21_21.msg (145 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Request for Authorization Waste Temporary Storage - Jul20_21.pdf (251.59 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Request for Authorization Waste Temporary Storage - Jul20_21.pdf (251.59 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Power Line Relocation -Jul15_21.pdf (348.84 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Power Line Relocation -Jul15_21.pdf (348.84 KB) |
|
|
Northwest Territories Power Corporation |
MV2017X0005 |
NTPC – Bluefish – Culvert Partial Washout 2021 - Jul14_21.pdf (4.63 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Effluent Treatment Plant Start-Up - Final Report - Jul12_21.pdf (2.09 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Effluent Treatment Plant Start-Up - Final Report - Jul12_21.pdf (2.09 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Non-Hazardous Waste Landfill - Start of Work Update - Email Communication - Jul6_21.pdf (281.41 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification - Non-Hazardous Waste Landfill - Start of Work Update and Request - Letter - Jul6_21.pdf (1.3 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Non-Hazardous Waste Landfill - Start of Work Update - Email Communication - Jul6_21.pdf (281.41 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification - Non-Hazardous Waste Landfill - Start of Work Update and Request - Letter - Jul6_21.pdf (1.3 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - LUI Notification 476721-0051 Northwest Pond HDPE Line Update - Jun30_21.pdf (283.3 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - LUI Notification 476721-0051 Northwest Pond HDPE Line Update - Jun30_21.pdf (283.3 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification - Winter Drilling Update - Jun28-21.pdf (4.12 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification - Winter Drilling Update - Jun28-21.pdf (4.12 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - Effluent Treatment Plant Start-Up Sample Results - Acute Toxicity Follow-up and Correspondence - Jun28_21.pdf (914.93 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - Effluent Treatment Plant Start-Up Sample Results - Acute Toxicity Follow-up and Correspondence - Jun28_21.pdf (914.93 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification - Effluent Treatment Plant Start-Up Sample Results - Jun25-21.pdf (1.09 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification Non-Hazardous Waste Landfill - Start of Work - Jun21-21.pdf (743.93 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification Non-Hazardous Waste Landfill - Start of Work - Jun21-21.pdf (743.93 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification Effluent Treatment Plant Start-Up - Jun21-21.pdf (144.89 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification Effluent Treatment Plant Start-Up - Jun21-21.pdf (144.89 KB) |
|
|
GNWT-INF |
W2020L8-0001 |
W2020L8-0001 - TASR - Authorization for Water Waste and Sewage until December 31 2021 - Jun 16_21.pdf (724.98 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - LUI Notification - Monitoring Wells - June11-21.pdf (49.31 MB) |
|
|
GNWT-INF |
W2020L8-0002 |
GNWT-INF - NWT Hwy 3 Repair Works - Notification - Notice of Project Activities - Jun 11_21.pdf (91.09 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - GMRP - Notification - Off-Site Borrow - Inspector Approval Correspondence - June4_21.pdf (692.42 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
DIAND-GIANT - Notification - Off-Site Borrow - Inspector Approval Correspondence - Jun4_21.pdf (250.52 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
DIAND-GIANT - GMRP - Notification - Off-Site Borrow - Inspector Approval Correspondence - June4_21.pdf (692.42 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification - Northwest Pond HDPE Line - May31-21.pdf (243.25 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Notification - Northwest Pond HDPE Line - May31-21.pdf (243.25 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2019X0007 - DIAND-GIANT - Notification - ETP Baghouse Removal - May28-21.pdf (92.08 KB) |
|
|
Miramar Northern Mining Ltd. |
MV2017L8-0008 |
MV2017L8-0008 - MNML - Con Mine - Intent to Discharge 1 - June -2021 - May21_21.pdf (251.76 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Early Works Drilling Program Notification - May7-21.pdf (116.54 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Early Works Drilling Program Notification - May7-21.pdf (116.54 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Giant Mine Remediation Project Newsletter - May7-21.pdf (131.02 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Giant Mine Remediation Project Newsletter - May7-21.pdf (131.02 KB) |
|
|
GNWT-INF |
W2019L8-0001 |
GNWT-INF - Rae Access Road - Date of Commencement of Project Activities - Apr 21_21.pdf (115.46 KB) |
|
|
Northwest Territories Power Corporation |
MV2017X0005 |
MV2017X0005 - NTPC - Road Closure for Season Notice - April16_21.pdf (2.21 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Winter Drilling Progress - Apr6-21.pdf (108.51 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Winter Drilling Progress - Apr6-21.pdf (108.51 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Inspector Comments RE Winter Drilling Progress - Apr6-21.pdf (189.88 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Inspector Comments RE Winter Drilling Progress - Apr6-21.pdf (189.88 KB) |
|
|
Miramar Northern Mining Ltd. |
MV2017L8-0008 |
MV2017L8-0008 - MNML - Con Mine - Meg Keg Peg Lakes System Study Design - March31_21.pdf (152.12 MB) |
|
|
Northwest Territories Power Corporation |
MV2020X0004 |
NTPC - Taltson Upgrades - Temporary Water Line Correspondence - Mar23-21.pdf (3.85 MB) |
|
|
Northwest Territories Power Corporation |
MV2020X0004 |
NTPC - Taltson Upgrades - Temporary Water Line Figure - Mar23-21.pdf (617.79 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Inspector Notification and Approval Request - Aggregate Use - Storage - Mar18-21.pdf (23.95 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - Inspector Notification and Approval Request - Aggregate Use and Storage - Mar18-21.pdf (23.95 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - GMRP - Settling Pond Sludge Removal - Notice and Inspector Approval - Mar18-21.pdf (32.21 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2019X0007 MV2007L8-0031 - DIAND-GIANT - GMRP - Settling Pond Sludge Removal - Notice and Inspector Approval - Mar18-21.pdf (32.21 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - GMRP - Power Pole Relocation Request and Inspector Approval - Mar17-21.pdf (26.8 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - GMRP - Power Pole Relocation Request and Inspector Approval - Mar17-21.pdf (26.8 MB) |
|
|
Northwest Territories Power Corporation |
MV2019L8-0008 |
MV2019F0015 MV2019L8-0008 - NTPC - Taltson Winter Road Closure for Heavy Hauling - March 11, 2021 - Mar12-21.pdf (150.61 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - GMRP Winter Drilling Schedule - Mar10-21.pdf (2.29 MB) |
|
|
Imperial Oil Resources Ltd. |
S20L8-005 |
S20L8-005 - Activity update - Mar 9_21.pdf (79.14 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - GMRP Winter Drilling Schedule - Mar8-21.pdf (110.38 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - GMRP Winter Drilling Schedule - Mar8-21.pdf (110.38 KB) |
|
|
Miramar Northern Mining Ltd. |
MV2017L8-0008 |
MV2017L8-0008 - MNML - Interim Approval - Meg Keg Peg System Study Design - Mar5-21.pdf (199.04 KB) |
|
|
Northwest Territories Power Corporation |
MV2019L8-0008 |
MV2019F0015 MV2019L8-0008 - NTPC - Taltson Winter Road - Weekly Report - February 23 - March 1 2021 - Mar3-21.pdf (1.04 MB) |
|
|
Northwest Territories Power Corporation |
MV2019L8-0008 |
MV2019F0015 MV2019L8-0008 - NTPC - Public Safety Notice - Taltson Winter Road Operation - Mar3-21.pdf (634.63 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Baker Pond and Mill Pond Winter Drilling Locations Notification - Feb 23-21.pdf (1.49 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2007L8-0031 MV2019X0007 - DIAND-GIANT - Baker Pond and Mill Pond Winter Drilling Locations Notification - Feb 23-21.pdf (1.49 MB) |
|
|
Northwest Territories Power Corporation |
MV2019L8-0008 |
MV2019L8-0008 MV2019F0015 - NTPC - Taltson Winter Road Report - Feb15-22-21.pdf (1.79 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 - DIAND-GIANT - Winter Drilling Update - Feb17-21.pdf (821.09 KB) |
|
|
Northwest Territories Power Corporation |
MV2020X0004 |
MV2020X0004 - NTPC - Taltson Upgrades - Staging Notification - Feb15-21.pdf (837.79 KB) |
|
|
Northwest Territories Power Corporation |
MV2019L8-0008 |
MV2019F0015 MV2019L8-0008 - NTPC - Taltson Winter Road - Weekly Report - February 1-7 2021 - Feb8-21.pdf (1.21 MB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 - DIAND-GIANT - Winter Drilling Program - Notification - Feb5-21.pdf (192.74 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 - DIAND-GIANT - Winter Drilling Update - Feb5-21.pdf (108.98 KB) |
|
|
DIAND-GIANT |
MV2007L8-0031 |
MV2007L8-0031 - DIAND-GIANT - 2021 Winter Investigation Drilling Maps - Feb5-21.pdf (22.13 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2019X0007 - DIAND-GIANT - Winter Drilling Update - Feb5-21.pdf (108.98 KB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2019X0007 - DIAND-GIANT - 2021 Winter Investigation Drilling Maps - Feb5-21.pdf (22.13 MB) |
|
|
Northwest Territories Power Corporation |
MV2017X0005 |
MV2017X0005 - Northwest Territories Power Corporation - Winter Road - Feb5_21.pdf (2.38 MB) |
|
|
DIAND-GIANT |
MV2019X0007 |
MV2019X0007 - DIAND-GIANT - Winter Drilling Program - Notification - Feb 5-21.pdf (192.74 KB) |
|
|
Northwest Territories Power Corporation |
MV2019L8-0008 |
MV2019F0015 MV2019L8-0008 - NTPC - Taltson Winter Road - Weekly Report - January 24-31 2021 - Feb1-21.pdf (1.03 MB) |
|
|
GNWT-INF |
W2020L8-0001 |
W2020L8-0001 - TASR - Notification - TASR Corridor Working Group Meeting December 1 2020 Minutes - Jan 27_21.pdf (4.48 MB) |
|
|
Northwest Territories Power Corporation |
MV2019L8-0008 |
MV2019F0015 MV2019L8-0008 - NTPC - Taltson Winter Road - Weekly Report - January 18-24 2021 - Jan25-21.pdf (560.11 KB) |
|
|